Published November 29, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Annapolis, Maryland. Completed plans call for site work for a water / sewer project.

The Work includes the following major items: The replacement of approximately 1.9 miles of existing 6"/8" sanitary force main through the combination of pipe bursting/splitting and open-cut methods including four (4) air release valve vaults (ARVs) and three (3) blow-off assembly vaults; the replacement of approximately 593 feet of 18"/20" sanitary force main including one (1) blow-off assembly vault; temporary bypassing and tapping. The Work is subject to the prevailing wage or local hiring laws of Anne Arundel County as more specifically set forth by law and by County policy. The Contractor and any subcontractor must submit the appropriate Wage Requirements Law and Local Hiring forms. This Contract will be constructed under the provisions of the Anne Arundel County Government January, 2001 "Standard Details and Specifications for Construction" and any subsequent revisions thereto. For Ada Accessibility Assistance ONLY: Anyone needing special ADA accommodations for the Pre-Bid conference must contact Joelle Ridgeway at 410-222-4383, or by email to agridg24@aacounty.org, at least seven days in advance of the event. TTY users, please call via Maryland Relay 7-1-1. All materials are available in an alternative format upon request. Questions regarding this Project should be directed to the PROJECT MANAGER, _Mr. Lee Greeenwald, at 443-285-1576. Each bid must be accompanied by a certified check or bid bond acceptable to the County for five percent (5%) of the amount of the bid, payable to Anne Arundel County, Maryland; and unless so accompanied, the bid will not be considered. The check or bid bond will be forfeited to the County as liquidated damages in case the contract, performance bond, and labor and materials bonds are not executed within ten (10) days after receiving the contract for execution. Total time for completion, 365 consecutive calendar days. Liquidated damages shall be, $1,000 dollars per calendar day.

Bid Results

Water / Sewer

$4,367,697.00

Public - County

Site Work

89

10

4

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
217
Bidding Soon
3,567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2023

January 8, 2024

Project location map

Multiple Locations, Annapolis, MD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.