BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Westminster, Maryland. Working plans call for the renovation of a educational facility.

**As of November 21, 2023 , this project has been cancelled and no definite date for the rebid.** Request for Qualifications (RFQ) from Fire Protection Contractors Contractors must submit questions through the Public Purchase web site, using the instructions below. Questions must be submitted 10 (ten) days prior to the closing date till October 7, 2023 Any questions concerning this matter may be referred to PrevailingWage@dllr.state.md.us State Legislature passed a bill that states if you receive $3MM in grant funds or more for construction projects, spend over $1MM per year during the construction period, a specific MBE goal will be assigned to the project by the state. As of now, that bill has not been signed and is not required for this project; however, if the bill is signed prior to the closing date of this proposal, it will be enforced. As of now, the county makes a good faith effort to meet a 10% MBE goal and the state 29%. We encourage the use of MBE/DBE firms The existing Fire Alarm System identified for phased removal consists of the following: o Six networked fire alarm control panels. o The panels are located in Buildings A, K, LRC, N, P, and T. o The main fire alarm panel is located in Building A. o All campus building fire alarm control panels are interconnected and report to the system in the fire command center located in the County Maintenance Shop in Building M. o Electronic components for the fire alarm panels are obsolete and replacement parts are no longer being manufactured. o Evacuation Strategy: Total Campus Evacuation - Upon activation of any fire alarm initiating device in any building, all campus buildings evacuate. o Initiating Devices o Manual Pull Stations located at all building exits. o Smoke Detectors Located throughout the buildings even where they are not required by codes. Located on the high atrium ceiling in Building A which makes required annual inspection, testing and maintenance difficult. o Heat Detectors o Sprinkler System Tamper and Flow Switch Monitoring o Carbon Monoxide Detectors - None o Notification Appliances o Wall mounted loudspeakers and strobes. o Locations are such that sound levels and visible alarm signals do not comply with Americans with Disabilities Act o Door Hold Opens for Fire Rated Doors - Devices are obsolete. o Fire Alarm Graphic Annunciator Panels (maps) at Building Fire Department Entrances are obsolete. The proposed new Fire Alarm System identified for phased installation will include: o Eight networked fire alarm control panels. o The panels will be located in Buildings A, C, K, LRC, M, N, P, and T. o All campus building fire alarm control panels will be interconnected and report to the system in the fire command center located in the County Maintenance Shop in Building M. A floor plan will automatically display the device in alarm on the workstation monitor in the Maintenance Office and also on mobile devices for maintenance and security personnel. o Evacuation Strategy: Total Campus Evacuation - Upon activation of any fire alarm initiating device in any building, all campus buildings evacuate. o Initiating Devices o Manual Pull Stations located at all building exits. o Spot-Type Smoke Detectors - Located only where they are required by codes. o Air Sampling Smoke Detection System Air inlets will be located on the high ceiling in the atrium in Building A. The smoke detector will be located in a room where it is easy to reach for required annual inspection, testing and maintenance. o Heat Detectors o Sprinkler System Tamper and Flow Switch Monitoring o Carbon Monoxide Detectors will be located in rooms with fuel-burning appliances o Notification Appliances o Wall and ceiling mounted loudspeakers and strobes. o Located so that sound levels and visible signals will comply with the Americans with Disabilities Act o Door Hold Opens for Fire Rated Doors o New up-to-date Fire Alarm Graphic Annunciator Panels (maps) will be installed at Building Fire Department Entrances

Final Planning

Educational

$450,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
112
Bidding Soon
2,077
All Active Projects
854
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2023

May 16, 2024

img_map_placeholder

1601 Washington Rd, Westminster, MD


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.