BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Demolition, site work and new construction of a fire / police facility in Southbridge, Massachusetts. Completed plans call for the construction of a 27,042-square-foot fire / police facility; and for site work for a fire / police facility.

Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. General Contractors and Filed Sub Bid Contractors have been Pre-Qualified. A list of all Pre-Qualified contractors can be found in the Project Manual. Sub Bid Category Masonry, Misc Iron, Waterproofing, Roofing, Glass & Glazing, Metal Windows, Tiling, Acoustical Ceilings, Res Flooring, Painting, Fire Protection, Plumbing, HVAC and Electrical

Bid Results

Fire / Police

$22,536,727.00

Public - City

Demolition, New Construction, Site Work

179

42

95

8

Subscribe For Documents

239 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
724
Active Projects
370
Bidding Soon
4,957
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

June 16, 2025

Project location map

24 Elm St, Southbridge, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.