BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a bridge / tunnel in Monroe, Michigan. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for outdoor lighting for a bridge / tunnel.

As of November 28, 2023, the project has not been awarded. A timeline for award has not been confirmed. Reference Number 0000331843 This contract shall consist of bridge lighting replacement, timber decking replacement, bridge fencing replacement, approach repairs, and painting of the entire bridge structure. Bidders for any Construction Project whose bid is valued at greater than $175,000 in total, and subcontractors of any tier that intend to perform work valued at over $50,000.00 shall be determined to be a "Responsible Bidder" in accordance with the City's Purchasing and Contracts ordinance prior to award, and must submit a Bidder Information Questionnaire with their bid. Details on the entirety of this process are contained in Division D of the contract, and required forms are included in the Appendix to the contract. Should the prime bidder identify any trades / subcontracts where they have been unable to identify a potentially responsible bidder at the time of bid submission, this should be clearly noted on the bid form, so this may be evaluated for exception if possible. Question Acceptance Deadline 10/23/2023 04:30 PM EDT Questions are submitted online No General Requirements - Bidder /Preregistration Required - Bid Deposit Required - Insurance Required - Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Surety Bond 100 % - and Materials Bond 100 % - Payment Bond 100 % *The City of Monroe reserves the right to accept any proposal, to reject any proposal or to waive defects in proposals. A bid bond or certified check made payable to the City of Monroe in the amount of not less than five percent (5%) of the bid must be posted by each bidder with his / her bid. No bidder may withdraw his bid within SIXTY (60) days after the actual date of the opening thereof, but may withdraw it at any time prior to the scheduled closing time for receipts of bids.

Bid Results

Bridges / Tunnels

$1,420,455.00

Public - City

Outdoor Lighting, Paving, Site Work

15

9

5

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
86
Bidding Soon
1,276
All Active Projects
457
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2023

November 30, 2023

img_map_placeholder

Multiple Locations, Monroe, MI

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.