BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Seguin, Texas. Completed plans call for site work for a playground / park / athletic field.

The last day to submit questionsis October 20, 2023, by 5 p.m. An addendum answering all questions received will be issued by October 25, 2023. Each bid must be accompanied by a certified or cashier's check or an approved bidder's bond in an amount not less than 5% of the maximum total bid, payable to the City of Seguin, Texas, without recourse, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds on the forms provided, within ten (10) days after the award of contract. The City of Seguin reserves the right to reject any or all bids and to waive informalities Questions regarding interpretation of specifications, bids, bid results or bid awards should be directed in writing to the Buyer indicated in the General and/or Technical Specifications or to the Purchasing Manager, twood@seguintexas.gov and be referenced by bid number and bid title. The City of Seguin intends to hire one (1) highly qualified general contractor to provide all labor, equipment, materials, and insurance as required for the construction of one (1) concrete basketball court, as specified herein, within the Future Park Property located at 450 Dolle Avenue, Seguin, Texas. 2.0 Bidders are encouraged to visit the lighted basketball court at Seguin's Park West located at 809 San Antonio Avenue. The City's intention is to duplicate the Park West example at the Future Park Property. Excavate and construct a new concrete basketball court per the specifications on sheet C2. 4.0 The finished concrete basketball court should be approximately 1 to 4 inches above the existing grade, depending on the overall grade. Backfill as needed. 5.0 Apply one (1) coat of textured acrylic resurfacer over the entire court. 6.0 Apply two (2) coats of textured color (dark green) over the entire court. 7.0 Apply textured white lines per the specifications. 8.0 Furnish and install basketball goals per the specifications.

Award

Playgrounds / Parks / Athletic Fields

$143,930.00

Public - City

Site Work

16

4

23

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
41
Bidding Soon
2,304
All Active Projects
912
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2023

December 7, 2023

img_map_placeholder

450 Dolle Ave, Seguin, TX

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.