BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Milton, Massachusetts. Completed plans call for the renovation of a fire / police facility.

Bathroom Renovations at the Massachusetts State Police Milton Barracks 685 Hillside Street Milton, MA 02186 This project is scheduled for 150 calendar days to substantial completion and in general includes: The project scope includes renovation of first floor toilet room with new plumbing fixtures, radiation, piping, lighting, receptacles, fire alarm devices and related architectural work as indicated on the drawings. Converting of second floor storage room to a women's toilet room and shower room with new plumbing fixtures, radiation, piping, exhaust fan, lighting, receptacles, fire alarm devices and related architectural work as indicated on the drawings Each general bid proposal must be secured by an accompanying deposit of 5% of the total bid amount, including all alternates, in the form of a bid bond, a certified, treasurer's, or cashier's check issued by a responsible bank or trust company made payable to the Commonwealth of Massachusetts The project scope includes renovation of first floor toilet room with new plumbing fixtures, radiation, piping, lighting, receptacles, fire alarm devices and related architectural work as indicated on the drawings. Converting of second floor storage room to a women's toilet room and shower room with new plumbing fixtures, radiation, piping, exhaust fan, lighting, receptacles, fire alarm devices and related architectural work as indicated on the drawings. A Pre-Bid site visit will be held at site located at 685 Hillside Street Milton, MA 02186 on October 19, 2022 at 10:00AM. The Minority Business Enterprise participation goal for this Contract is _7.4%. The Women Business Enterprise participation goal for this Contract is _4.0%. The applicable minority workforce utilization percentage, if any, is __5.0%____. The applicable women workforce utilization percentage, if any, is __5.0%___ If there is any questions please contact Paul Hession, Director of Facilities at (508) 820-2650.

Post-Bid

Fire / Police

$135,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
153
Bidding Soon
2,651
All Active Projects
1,103
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2023

December 4, 2023

img_map_placeholder

685 Hillside St, Milton, MA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.