This is a service / maintenance or supply contract in Lethbridge, Alberta. Contact the soliciting agency for additional information.

Background The Bigelow Dam is located in central Alberta northwest of Trochu as shown in Figure 1.0 of the TOR. The main purpose of the system is to regulate flow on Threehills Creek for agricultural purposes, provide breeding habitat for waterflow, and create recreational opportunities. The Bigelow Dam consists of a 216m long, 10m high embankment dam, concrete drop inlet spillway structure, low level outlet, sheet pile auxiliary spillway, and natural spillway. The main dam was constructed in 1973 and is a homogeneous dam with an upstream pervious toe. The drop inlet structure is a 3.05m square drop inlet that exits through a 2.13 diameter corrugated steel pipe (CSP) low level outlet. The CSP was originally 2.28m in diameter but was later lined with a 2.13m steel pipe due to deterioration of the original pipe. The Bigelow Dam Site and Drawing are shown in Figure 2.0 of the TOR. Low Level Outlet The 2.13m diameter low level outlet (LLO) conduit does not appear to have a coating system and corrosion has been observed along the length of the pipe. The downstream end of the conduit has light pitting while the upstream end has moderate pitting and some scaling as shown in Figure 3.0 of the TOR. While all 19 welds were inspected and determined to be in satisfactory condition (2021 DSR), there were dents observed near the crown of the conduit. A survey of the interior of the conduit to measure deformation and the thickness of the liner is required to set a quantitative baseline that can be referenced to determine the rate of deterioration of the steel liner. The design drawing of the Bigelow Dam Low Level Outlet is available in Appendix D. The 2022 PMFEA report commented that while the available drawings indicate that the riprap cover extends to the crest on the upstream face of the dam, it could not be confirmed due to the soil and grass coverage on site. A review needs to be done to verify the extent of rip rap on the upstream slope of the dam and determine if the riparap on the upstream slope requires raising beyond the current coverage. The method of Contractor Selection has not been Determined at this time

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
3
Bidding Soon
74
All Active Projects
19
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.