BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Snoqualmie Pass, Washington. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Construction of a new reinforced concrete water storage reservoir adjacent to two existing concrete tanks that has a capacity of 232,000 gallons (30 ft diameter x 44 ft height), including site piping and grading necessary for construction of the new tank. The project also includes upgrades to the altitude valve station, new water inlet piping to the existing reservoirs, and electrical and control system upgrades. This contract has one hundred ninety (90) working days to complete the work. Each bid or proposal must be accompanied by bond or a certified check, payable to the order of the Treasurer of the Snoqualmie Pass Utility District for the sum of not less than 5% of said bid or proposal and none will be considered unless accompanied by such deposit, to be forfeited to the Snoqualmie Pass Utility District in the event the successful bidder shall fail or refuse to enter into a Contract with the City for the making and construction of the aforesaid improvement. All bids or proposals must be in writing on the form bound in the Specifications, sealed and filed with the Clerk on or before the day and hour above mentioned.. The Snoqualmie Pass Utility District reserves the right to reject any and all bids and to waive technicalities or irregularities, and after careful consideration of all bids and factors involved, make the award to best serve the interests of the Snoqualmie Pass Utility District.

Award

Water / Sewer

$1,733,493.00

Public - City

New Construction, Site Work

3

13

2

8

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
62
Bidding Soon
1,807
All Active Projects
565
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 2, 2023

January 1, 2024

May 6, 2024

img_map_placeholder

To Be Determined, Snoqualmie Pass, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.