BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a playground / park / athletic field in Moulton, Iowa. Completed plans call for site work for a playground / park / athletic field.

As of November 10, 2023, project was awarded to Park Planet, awarded amount is $240,095.32 A. Project Name: Moulton-Udell CSD - 2023 Playground B. Architect's Name: Shive-Hattery, Inc. C. The Project consists of a new playground including poured in placed surfacing and various playground amenities. Improvements also include swing set with engineered wood fiber surfacing. 1.2 PROJECT SCHEDULE A. The project schedule is defined in the Notice to Bidders. 1.3 WORK UNDER OTHER CONTRACTS A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts. New playground including poured in placed surfacing and various playground amenities. Improvements also include swing set with engineered wood fiber surfacing. Each Bidder Shall Accompany the Bid With a Bid Security, in a Separate Envelope, as Security That the Successful Bidder Will Enter Into a Contract for the Work Bid Upon and Will Furnish After the Award of the Contract Corporate Surety Bond or Bonds, Acceptable to the Owner, for the Faithful Performance of the Contract, in an Amount Equivalent to One Hundred Percent of the Amount of the Contract. The Bidder's Security Shall Be in an Amount Equivalent to 5% of the Bid Amount, and Shall Be in the Form of a Cashier's or Certified Check Drawn on a Bank in Iowa or a Bank Chartered Under the Laws of the United States of America, or a Certified Bank Share Draft Drawn on a Credit Union in Iowa or Chartered Under the Laws of the United States of America or a Bid Bond With Corporate Surety Satisfactory to the Owner. The work must commence on March 1 2024 and must be substantially completed by May 31, 2024 with final completion by June 14, 2024. The Owner reserves the right to reject any or all bids.

Award

Playgrounds / Parks / Athletic Fields

$240,095.00

Public - County

Site Work

8

11

5

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
76
Bidding Soon
955
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2023

March 1, 2024

Project location map

305 E 8th St, Moulton, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.