Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 17, 2026 at 8:00 PM

Updated October 21, 2026

Site work and paving for a mixed-use development in Riverside, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reconstruction of Riverway Boulevard from NW Tullison Road to NW Platte Drive with an adjacent 10 wide concrete trail and 5 wide concrete sidewalk, a roundabout at the intersection of Riverway Boulevard and NW Tullison Road, reconstruction of approximately 700 of NW Tullison Road with a 10 concrete trail, extension of approximately 1,100 of Riverside Drive with a 5 wide concrete sidewalk, construction of a culde-sac at NW Business Park Lane, obliteration and construction of realigned Missouri Route 9 on-ramp, reconstruction of Missouri Route 9 off-ramp, two retaining walls under Missouri Route 9 bridges, parking lot improvements, detention basin and associated project grading, driveway entrances, landscaping, storm sewer improvements, and other associated features. The Add Alternate includes reconstruction of Riverway Boulevard and NW Platte Drive intersection with a roundabout as well as reconstruction of approximately 800 of NW Platte Drive with two 10 wide concrete trails, parking lot improvements, and associated project grading, driveway entrances, landscaping, storm sewer improvements, and other associated features. All bidders must be on MoDOTs Qualified Contractor List or Prime Vendor List. The contractor questionnaire must be on file 7 days prior to bid opening. The contract, if awarded, will be awarded to the lowest, responsive, responsible bidder complying with the Conditions of the Contract Documents within the Owners budget. The Bidder to whom the awards are made will be notified at the earliest possible date. The Owner, however, reserves the right to reject any and all Bids and to waive any informality in Bids received whenever such rejection or waiver is in his interest. MO DOT - Riverway Boulevard Improvements Question Deadline 09/23/2026 Submit completed Contractor Questionnaire and/or Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening.

GC Bidding

Roads / Highways

$4,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
80
Bidding Soon
1,299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2026

December 29, 2026

Project location map

Riverway Blvd, Riverside, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed