BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Tolono, Illinois. Completed plans call for the renovation of a educational facility.

CUSD#7 is seeking bids for: Unity East and Unity West gym flooring removal and replacement. Prevailing wage guidelines must be met. Company must provide proof of insurance and be bonded. Please contact Andrew Larson, Superintendent of Schools, with questions and to get a copy of the scope of the project (217-485-6510) or at larsona@unity.k12.il.us. o Removal of existing floor in both elementary cafeteria/gym areas at Unity East and Unity West Elementary buildings. This would include detaching and moving the bleachers from the wall and once new flooring is in place, to be moved back and reattached to the wall. Bleachers should work as they did prior to this project once completed. Cove base will also need to be removed and area prepped to replace cove base once new flooring is installed. o Work cannot begin in either of the buildings until May 28, 2024. Work will need to be completed by July 15, 2024 at both facilities. o It will be the awarded bidder's responsibility to remove all existing flooring material from the job site. o The specific flooring that will be used for this job is: MONDO ADVANCED NEW GENERATION, L70 Light Grey 8 mm. There are no exceptions but to use this specific flooring to replace existing. The net square footage for each gym is 6500 sq. ft. o After existing flooring and cove base is removed it is the approved bidder's responsibility to prep the surface for the new flooring to be installed. o All logos and lines that are on existing floor will need to be added after the new floor is installed, (see diagram) o Any damages to proper that are caused by the removal or install at either elementary building are the responsibility ofthe awarded bidder. o Standard 4" black vinyl cove base will need to be installed after floor install. o To be considered as the possible awarded bid contractor, all bidders must attend a pre-bid meeting at Unity West Elementary, 1035 CR 600 N Tolono, IL 61880 on November 1, 2023 at 9:15 a.m. o Assess flooring subsurface for moisture content and work with school district on possible addition of a moisture barrier coating prior to install ofnew flooring surface. o All workers must be cleared on contractor's end to work in a school setting. o You will have access to one restroom facility adjacent to the gym.

Award

Educational

$277,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
22
Bidding Soon
409
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2023

December 14, 2023

img_map_placeholder

Multiple Locations, Tolono, IL

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.