BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Site work and paving for a road / highway in Tolono, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of March 4, 2025, this project has not yet been awarded. The project is expected to be awarded on March 13, 2025. 2025 ASPHALT MAINTENANCE CUSD #7 (Tolono) is receiving bids for the Summer of 2025 ASPHALT MAINTENANCE at various locations. CUSD #7 (Tolono) Asphalt Repair and Reseal Scope ofWork The Board ofEducation, Community Unit School District #7, invites bids for asphalt repair and resealing across the district's campuses. The project includes asphalt repair, sealcoating, and striping at the following locations: CUSD #7 (Tolono) is receiving bids for the Summer of2025 ASPHALT MAINTENANCE at various locations. Bids are due Monday, March 3, 2025 at 9:00 a.m. after which time they will be publicly opened and read aloud. Bids are to be submitted to: CUSD #7 (Tolono) Attention: Dr. Brian Brink, 1121 CR 800N, Tolono, Illinois 61880. Bids must be clearly marked: Bid - Tolono- CUSD #7 Asphalt Repair and Reseal. The bid opening will take place in the offices ofCUSD #7 at 10 a.m. on March 3, 2025. Bid specifications are available in the Office ofthe Superintendent, 1121 County Road 800 N, Tolono, IL, 61880. Bid specifications may also be obtained by calling Deanna Wheeler, District Bookkeeper, at (217) 485-6510. The Board ofEducation reserves the right to reject any and all bids, to accept bids in whole or in part and/or to waive any irregularities or defects in the proposal, when, in its opinion, such action will serve the best interests ofthe Board ofEducation ofCUSD #7 (Tolono). o Asphalt Replacement: Contractor will perform full-depth (no less than 5") removal and replacement ofdamaged asphalt sections, including inspection and compaction ofthe base with replacement and refill of areas as necessary. Areas to be patched will be coordinated with school administration. o Crack Filling: Contractor will clean out all existing cracks in excess of %" in width by mechanical routing to a minimum of %" x %" and apply hot rubberized crack fillerthat meets ASTM 6690 Type II Specifications. 1. Junior High/High School Main Campus: Parking lots, entrances, and drives (approximately 225,830 sq. ft.) 2. Unity East: Parking lots, entrances, drives, and playground (approximately 89,200 sq. ft. for parking areas plus an additional 8,510 sq. ft. for playground) 3. Unity West: Parking lots, entrances, drives, and playground (approximately 94,355 sq. ft. for parking areas plus an additional 13,160 sq. ft. for playground) The Board of Education reserves the right to reject any and all bids, to accept bids in whole or in part and/or to waive any irregularities or defects in the proposal, when, in its opinion, such action will serve the best interests of the Board of Education of CUSD #7 (Tolono). Questions regarding the bid shall be submitted in writing to brinkb@unity.kl2.il.us so that they are received no later than 5 p.m. February 15, 2025.

Award

Roads / Highways

$305,866.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
56
Bidding Soon
831
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

June 1, 2025

Project location map

Multiple Locations, Tolono, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.