BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and renovation of a mixed-use development in Los Altos Hills, California. Completed plans call for the renovation of a educational facility; for site work for a playground / park / athletic field; road / highway; and for paving for a road / highway.

Project 104, Stadium Bleachers and Path of Travel Upgrades includes the following: Remove existing bleacher rows and install new accessible seating area at East Bleachers; At north end of east bleachers, remove existing asphalt path and replace with the new concrete and asphalt accessible egress path; At south end of bleachers, install new concrete and asphalt accessible egress path; Re-stripe accessible parking stalls and signage upgrade as shown in plans; Remove partitions in Women's Restrooms and renovate as shown in plans including plumbing fixtures, cap utilities, relocation of baby changing station, and patch back. No work at west bleachers. Women's Restroom Modification to remove partitions, plumbing fixtures, cap utilities, relocate baby changing station, and patch back. License Requirements General Building Contractor - Licensed B Liquidated Damages Yes Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Q&A Deadline 10/25/2023 12:00 PM (PDT) THE SCOPE OF WORK IS AS FOLLOWS: PATH OF TRAVEL AND BLEACHER SEATING ACCESSIBILITY UPGRADES -REMOVE EXISTING BLEACHER ROWS AND INSTALL NEW ACCESSIBLE SEATING AREA AT EAST BLEACHERS. AT NORTH END OF EAST BLEACHERS, REMOVE EXISTING ASPHALT PATH AND REPLACE WITH NEW CONCRETE ACCESSIBLE EGRESS PATH. AT SOUTH END OF BLEACHERS, INSTALL NEW CONCRETE ACCESSIBLE EGRESS PATH. -RE-STRIPE ACCESSIBLE PARKING STALLS AND SIGNAGE UPGRADE. -NO WORK AT WEST BLEACHERS. CONTINGENT As shown in LCA Architect's plans included for this bid, Project 104, Stadium Bleachers and Path of Travel Upgrades includes the following: Remove existing bleacher rows and install new accessible seating area at East Bleachers; At north end of east bleachers, remove existing asphalt path and replace with the new concrete and asphalt accessible egress path; At south end of bleachers, install new concrete and asphalt accessible egress path; Re-stripe accessible parking stalls and signage upgrade as shown in plans; Remove partitions in Women's Restrooms and renovate as shown in plans including plumbing fixtures, cap utilities, relocation of baby changing station, and patch back. No work at west bleachers. Women's Restroom Modification to remove partitions, plumbing fixtures, cap utilities, relocate baby changing station, and patch back. A. All work shall be in accordance with the California Building Code, 2019 edition or as indicated on the Contract Drawings, State approved accessibility codes, and applicable city ordinances. B. Time is of the essence in this Contract, and work is to proceed as rapidly as possible, commensurate with good workmanship. C. Contractor shall pay for any temporary utilities. D. Contractor to lay out the work with exact locations and elevations as shown in the Drawings. E. All of the Site facilities existing structures, and improvements shall be protected from damage by the Contractor. Any damage as a result of this work will be the Contractor's responsibility to restore to condition at the time of Notice to Proceed. F. Provided Storm Water Pollution Prevention Plan if site conditions and contractor's work requires it.

Award

Playgrounds / Parks / Athletic Fields

$504,740.00

Public - County

Paving, Renovation, Site Work

16

20

8

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
73
Bidding Soon
1,467
All Active Projects
633
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2023

January 2, 2024

img_map_placeholder

12345 El Monte Rd, Los Altos Hills, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.