BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Gowanda, New York. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown and described on the plan drawings and within these specifications including, but not necessarily limited to the following: Spillway - The catwalk bridge crossing the spillway, and adjacent concrete substructures/walls/slabs, shall be removed, rehabilitated, and replaced, as indicated on the plan drawings. Reservoir - The south wall of the reservoir suffered washouts and loss of rip rap. The embankment will be repaired, and new rip rap installed, covered in topsoil and seeded. Debris accumulated within the reservoir will be removed and disposed of, as indicated within the plan drawings. Gate House and Sluice Gates - The inlet structure will be rehabilitated, including removal and replacement of the ladder to access the valves, pressure washing, re-sealing, and rehabilitation of the existing mechanical equipment. The overflow standpipe, sluice gate and all valves need to be repaired, painted and/or greased. Access Roads and Cleanout Area - Rebuild the access road(s) at the completion of the project work. The repair will consist of grading, geotextile and placement of an appropriate crushed stone surface. Forebay (now Pt. Peter Brook) and Access Drive - Reconstruct what used to be the forebay by excavating the stream channel and storing deposited stream materials, place new rip rap, cover, and stabilize streambed and banks; repair the stream access ramp with rip rap and gravel surfacing. Allen Springs - Repair/replace medium stone rip rap placed to armor the stream. Replace telemetry at the water intake and replace related conduit and electrical wiring installed between the gate house, forebay and the spring water intake structure. Point Peter Brook - Reestablish the southern stream banks with a heavy stone buttress made up of heavy and light stone rip rap and rock spurs. Replace heavy stone rip rap on all banks/streambed within the project limits as indicated on the plan drawings. In addition, the following mitigation measures are being proposed as part of the proposed project, the installation of additional rip rap to strengthen the berm between the forebay and the reservoir, and riprap along Peter Point Brook, and the addition of a new outlet/bypass consisting of a 9-ft x 14-ft precast concrete box culvert and associated headwalls, sump and drainage structure. Minority Owned Sub-Contracting Goal: 6.3% Women Owned Sub-Contracting Goal: 6.9%

Award

Bridges / Tunnels

$3,187,830.00

Public - City

Paving, Site Work

33

11

2

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
125
Bidding Soon
1,914
All Active Projects
764
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 13, 2023

December 13, 2023

December 31, 2024

img_map_placeholder

27 E Main St, Gowanda, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.