Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 21, 2023 at 7:00 PM
Updated March 1, 2024
Site work and paving for a bridge / tunnel in Gowanda, New York. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown and described on the plan drawings and within these specifications including, but not necessarily limited to the following: Spillway - The catwalk bridge crossing the spillway, and adjacent concrete substructures/walls/slabs, shall be removed, rehabilitated, and replaced, as indicated on the plan drawings. Reservoir - The south wall of the reservoir suffered washouts and loss of rip rap. The embankment will be repaired, and new rip rap installed, covered in topsoil and seeded. Debris accumulated within the reservoir will be removed and disposed of, as indicated within the plan drawings. Gate House and Sluice Gates - The inlet structure will be rehabilitated, including removal and replacement of the ladder to access the valves, pressure washing, re-sealing, and rehabilitation of the existing mechanical equipment. The overflow standpipe, sluice gate and all valves need to be repaired, painted and/or greased. Access Roads and Cleanout Area - Rebuild the access road(s) at the completion of the project work. The repair will consist of grading, geotextile and placement of an appropriate crushed stone surface. Forebay (now Pt. Peter Brook) and Access Drive - Reconstruct what used to be the forebay by excavating the stream channel and storing deposited stream materials, place new rip rap, cover, and stabilize streambed and banks; repair the stream access ramp with rip rap and gravel surfacing. Allen Springs - Repair/replace medium stone rip rap placed to armor the stream. Replace telemetry at the water intake and replace related conduit and electrical wiring installed between the gate house, forebay and the spring water intake structure. Point Peter Brook - Reestablish the southern stream banks with a heavy stone buttress made up of heavy and light stone rip rap and rock spurs. Replace heavy stone rip rap on all banks/streambed within the project limits as indicated on the plan drawings. In addition, the following mitigation measures are being proposed as part of the proposed project, the installation of additional rip rap to strengthen the berm between the forebay and the reservoir, and riprap along Peter Point Brook, and the addition of a new outlet/bypass consisting of a 9-ft x 14-ft precast concrete box culvert and associated headwalls, sump and drainage structure. Minority Owned Sub-Contracting Goal: 6.3% Women Owned Sub-Contracting Goal: 6.9%
Award
Bridges / Tunnels
$3,187,830.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 13, 2023
December 13, 2023
27 E Main St, Gowanda, NY
Related To This Project
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed