Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Clive, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
A stage will be considered substantially complete when all work on the stage has been completed as follows: street, intersection and driveway pavements reopened to vehicular traffic, sidewalks and curb ramps backfilled and reopened to pedestrian traffic, permanent mailboxes installed/regular mail service resumed, and temporary stabilization of all disturbed areas. Punch list items and permanent stabilization not requiring additional street closures may be completed after opening a stage at the City's discretion. This project includes all materials, equipment, transportation, and labor necessary for the reconstruction of NW 99th Court between Clark Street and Lincoln Avenue. Project items include PCC pavement, sanitary sewer, water main, storm sewer, sidewalk, driveways, traffic control, restoration, and associated work. Specific project location along with the kind and approximate quantity of materials to be used shall be as set forth in the Plans and Specifications. Each bidder shall accompany its bid with bid security as defined in Section 26.8 of the Iowa Code and as outlined in the Instruction to Bidders in an amount equal to Ten (10) percent of the total bid amount. Time for Commencement and Completion of Work. Work on the improvements shall commence on or before the late start date of April 15, 2024. Assignment of calendar days and incentive/disincentive clauses associated with the three stages of construction delineated in the plans shall be as follows: Stage 1 - Sixty-five (65) calendar days Stage 2 - Forty-five (45) calendar days Stage 3 - Fifty-five (55) calendar days A normal work week is Monday through Saturday. No work will be allowed on Sundays, Memorial Day (5/27/24), the 4th of July (7/4/24), or Labor Day (9/2/24). Overall Project Incentive - A one-time lump sum incentive of $50,000 will be addedtotheproject contract if the entire project is fully completed and reopened to traffic by 5:00pmonFriday, November 8, 2024. Full completion includes restoration/sodding in all stages andcompletionofoutstanding punch list items. This is a No Excuses Date independent of the countingof calendardays during the three stages of construction and will not be shifted once constructionof theproject has commenced. Overall Project Disincentive - A lump sum disincentive of $25,000 will be deductedfromtheproject contract if final completion does not occur on or before November 29, 2024. Anadditional lump sum disincentive of $25,000 will be deducted from the project contract if final completiondoes not occur on or before December 31, 2024. No additional disincentives will be appliedduringthe 2025 construction season if, for whatever reason, work on the project is not completedinthe2024 calendar year. There are no liquidated damages associated with the overall completionof theproject. The City of Clive reserves the right to reject any and all bids. Contract Documents. Copies of the contract documents are available from the Public Works Department and may be examined at the Public Works Facility, 2123 NW 111 th Street, Clive, Iowa. Copies shall be available at no cost.
Award
Roads / Highways
$1,521,703.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 1, 2024
April 15, 2024
NW 99th Ct, Clive, IA
Related To This Project
Clive, IA
Bid Date: Jan 25 2024
Clive, IA
Bid Date: Dec 05 2023
Clive, IA
Bid Date: Dec 05 2023
Clive, IA
--
Clive, IA
Bid Date: Dec 04 2018
Clive, IA
--
Clive, IA
Bid Date: Oct 05 2023
Clive, IA
--
Clive, IA
Bid Date: Mar 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.