Published January 12, 2024 at 7:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Elyria, Ohio. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Additional terms used in these Instructions to Contractor are defined as follows: UNDERGROUND FACILITIES - All pipes, conduits, ducts, cables, fiber optic cables, wires, service connections, manholes, closeouts, valves, vaults, pull boxes, tanks, tunnels, culverts or other such facilities or attachments, and encasements containing such facilities privately or publicly owned which have been installed underground to furnish any of the following services or materials: electricity, gas, steam, liquid petroleum products, street lighting, telephone or other communications, cable television, sewage and drainage removal, traffic or other control systems, or water. WORK - The entire completed construction or the various separately identifiable parts thereof required to be furnished under the contract documents. Work includes and is the result of performing or furnishing labor and furnishing and incorporating materials and equipment into the construction, and performing or furnishing services and furnishing documents, all as required by the contract documents. AWARD OF CONTRACT The City reserves the right to reject any or all bids, including without limitation, the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional bids, and to reject the bid of any Contractor if the City believes that it would not be in the best interest of the City to make an award to that Contractor, whether because the bid is not responsive or the Contractor is unqualified or of doubtful financial ability or fail to meet any other pertinent standard or criteria established by the City. SALES TAXES The City is exempt from Ohio State sales and use taxes on the materials and equipment to be incorporated into the work. Said taxes shall not be included in the bid price. The contractor shall contact the City Auditor's Office at 440-326-1530 for completion of the tax-exempt forms required for the project. SUBMISSION OF BIDS Bids shall be submitted at the time and place indicated in the Invitation to Contractors or as indicated by the Engineer and shall include the name and address of the Contractor. Bids may be sent through the mail, via email or delivered by another delivery system. The Contractor will be notified if a bid is received after the deadline for delivery of bids, and that bid will not be considered for the project. INSURANCE Insurance Coverage Requirements. Contractor agrees to procure and maintain during the term of this Agreement insurance in the types and amounts shown below. a) Worker's Compensation in full compliance with the requirements of the State of Ohio. Warranty the contractor hereby warrants that the services will not infringe, misappropriate or violate any intellectual property or any other right of any person or entity. the services will be performed professional and workmanlike manner, consistent with industry standards. the services will be performed in strict accordance with the highest standards of care, skill, diligence and professional competence applicable to suppliers/contractors engaged in providing similar services in the Lorain county area. the contractor has the requisite skill and staff to perform the services required hereunder fully, in a timely and efficient manner. the contractor will perform the services in accordance with all applicable laws.

Award

Sidewalks / Parking Lot

$18,616.00

Public - City

Paving, Site Work

3

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
91
Bidding Soon
1,300
All Active Projects
566
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2023

November 20, 2023

img_map_placeholder

Multiple Locations, Elyria, OH

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Sidewalk Assessment Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.