EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 21, 2023 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in South San Francisco, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

HSIP - Curb Ramp Replacement Project. Question Submission Deadline November 3, 2023, 3:00pm The work consists of removals, paving, concrete sidewalk, curb ramps, curbs and gutters, and striping construction located at the Walnut Ave & Lux Ave, Walnut Ave & Park Way, Olive Ave and Pine Ave, Olive Ave and Aspen Ave, and Linden Ave & 8th Ln intersections in South San Francisco, CA. Liquidated Damages Hot mix asphalt around the raised utility shall be placed and compacted within twenty-four (24) hours of raising the utility. Specific liquidated damages for each utility adjustment delay shall be in the sum of one hundred dollars ($100) per calendar day. The Contractor shall be assessed for the working days for non-compliance, and the liquidated damages specified or at the City's option, hire outside Contractors to perform the work. Description The Contractor Shall Furnish All Labor, Materials and Equipment Necessary for Public Notification and Street Posting and Distribution of Notices for the Following Scopes of Work For the Duration of the Construction Period. Cashier's check or certified check, payable to the order of the City of South San Francisco, of not less ten percent (10%) of the bid or a bond in said amount, payable to the City of South San Francisco and signed by the bidder as well as a corporate surety, shall accompany the bid. Failure by the Contractor to follow the striping and pavement marking schedule per the approved schedule, scope of work specified, and all incidental work as required by this bid item shall be deemed as non-compliance to the contract provisions and shall be final. Aggregate base exceeding a workable moisture content will be rejected by the Engineer and shall be immediately removed from the project site by the Contractor

Award

Roads / Highways

$676,580.00

Public - City

Paving, Site Work

55

6

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
127
Bidding Soon
2,021
All Active Projects
1,021
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2023

December 18, 2023

img_map_placeholder

Multiple Locations, South San Francisco, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 Curb Ramp Improvement Project - HSIP

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.