BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Winnipeg, Manitoba. Completed plans call for the renovation of a educational facility.

This Request for Proposals is an invitation by the St James Assiniboia School Divison to prospective proponents to submit proposals for Lincoln Middle School New Elevator, Lifts and Barrier Free Upgrades in Winnipeg, Manitoba. 1comply With the Requirements of This Section When Performing the Following Work, as Outlined in Section 02 82 00 - Asbestos Abatement - Summary of Work, and to Confirm Locations and Approximate Quantities of Asbestos Materials. .1 Remove and Dispose of Asbestos-containing Caulking Applied Between the Building and the Frame of the Interior Storefront in the Northwest Entrance. .2 Remove and Dispose of Asbestos-containing Vinyl Floor Tiles Located in Room 11 as Needed to Facilitate New Installations. .3 the Scope of Work is to Include, but Not Be Limited to, Materials Identified During the Site Walkthrough, Summary of Work, Architectural Drawings, and as Directed by the Owner or Consultant. .4 the Contractor is Responsible for All Final Quantity Determinations. .5 All Work Will Be Subject to Visual Inspection Inside and Outside the Asbestos Work Area(S) by the Environmental Consultant. Any Contamination of the Surrounding Areas, Indicated by Visual Inspection, Shall Necessitate Complete Cleanup of Affected Areas by the Contractor, at No Cost to the Owner. The Contractor Recognizes That Time is of the Essence in Remedying Any Noted Contamination or Other Deficiencies. .6 the Contractor Shall Ensure That Supervisory Personnel, That Has Successfully Undergone a Minimum Three-day Asbestos Abatement Course Approved by Manitoba Workplace Health and Safety, is Present on Site During All Removal Activities. 7 the Contractor Shall Ensure That All Abatement Personnel Have Successfully Undergone a Minimum Two-day Asbestos Abatement Course Approved by Manitoba Workplace Health and Safety. 8 the Contractor Must Notify the Manitoba Department of Workplace Safety and Health 5-days Prior to Commencement of Contaminated Work. 9 the Contractor Must Notify the Environmental Consultant 24-hours Prior to Requiring a Final Visual Inspection for All Type 1 Work Areas. .10 the Contractor Will Be Responsible for All Costs Incurred for the Completion of Additional Final Visual Inspections or Air Clearance Monitoring, if Requested, if the First Inspection or Air Clearance Tests Fail. Question Acceptance Deadline: 2023/11/01 04:00:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Educational

$200,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
51
Bidding Soon
528
All Active Projects
231
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 7, 2023

December 7, 2023

img_map_placeholder

3180 Mcbey Ave, Winnipeg, MB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.