BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Summerton, South Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Goat Island Water System, Elevated Storage Tank Improvements, Division "B" Construction of : 150,000-Gallon elevated water storage tank and associated site work. Also includes the following bid alternates: Sigfield Well chemical building, Gin Pond Well chemical building. Gin Pond altitude valve and vault. Refer to American Engineering Consultants website for detailed project description. Contact Chris Waddell at CWaddell@aec-sc-sc.com 803-791-1400. Project Location: Town of Summerton, SC Construction of a new 150,000-Gallon elevated water storage tank at the Town of Summerton's Gin Pond Well site, including clearing, grubbing, and grading of the site, construction of a deep pile foundation, yard piping, site and electrical improvements, and all other necessary appurtenances as specified and depicted in the Contract Documents. The base bid also includes work at the Town of Summerton's Goat Island Well including demolition of a hydropneumatic tank and associated yard piping, and construction of new yard piping improvements. Additive Alternate A: Construction of a new chemical feed system at the Town of Summertons Sigfield Well including demolition of a hydropneumatic tank and associated yard piping, and construction of new chemical building including equipment and yard piping improvements. Additive Alternate B: Construction of a new chemical feed system at the Town of Summertons Gin Pond Well including demolition of a hydropneumatic tank and associated yard piping, and construction of new chemical building including equipment and yard piping improvements. Additive Alternate C: Construction of a new control valve vault at the Town of Summertons Gin Pond Well including construction of new precast concrete valve vault, piping, valves, and appurtenances. Any inquiry received before the close of business on Thursday, November 16, 2023 shall be given consideration. All project related questions must be directed to Chris Waddell, P.E. at American Engineering Consultants, Inc. by fax (803-791-8110) or by email (cwaddell@aec-sc.com).

Bid Results

Water / Sewer

$2,293,400.00

Public - City

Renovation, Site Work

20

19

2

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
63
Bidding Soon
599
All Active Projects
266
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2023

February 1, 2024

img_map_placeholder

Multiple Locations, Summerton, SC

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.