BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 25, 2023 at 8:00 PM

Updated January 27, 2024

Site work and outdoor lighting for a municipal facility in Tacoma, Washington. Conceptual plans call for site work for a municipal facility; and for outdoor lighting for a municipal facility.

The Port of Tacoma (Port) is soliciting Statements of Qualifications (SOQ) from firms qualified and interested in providing professional consulting services in engineering design to produce public works procurement packages for a low permeability containment wall and redeveloping 34-acres into a flexible-use surfaced lot. This solicitation will support the implementation of two Interim Actions in the former Arkema Manufacturing Area. This effort is subject to the requirements of the State of Washington Agreed Order No. DE 5668 (Attachment A). The first planned interim action is for a low-permeability wall, or containment wall, to encompass a 6-acre area with high concentrations of arsenic. This solicitation is for consulting services to complete wall design, support the existing project team's efforts to obtain regulatory approval, and develop a public works procurement package. The second planned interim action is capping areas with lower concentrations of arsenic, while incorporating improvements consistent with future marine-dependent land use. This solicitation includes consulting design services for capping and redevelopment of the approximately 34-acre site in stages that align with interim action phasing. The construction sequence must also be phased in order to limit the risk of contaminating materials with onsite arsenic impacted materials. The Port anticipates the award of one (1) professional service contract. The initial period of performance of the contract is anticipated to be (16) sixteen months from the execution of the contract. This effort is also subject to reimbursement requirements in existing and future Toxics Cleanup Program grants from the Washington Department of Ecology. All work must be performed in accordance with associated grant requirements. The Port may apply for federal and or state funding for various phases of Arkema Redevelopment and Containment Wall. Therefore, the contract that results from the RFQ and various work packages will be subject to the Federal Terms and Conditions of each grant. See "Attachment D" for the generic Federal and Washington state Terms and Conditions, which may be updated per each grant. The initial scope of work is for 30% design, but requested services may include final design, phased procurement packages including plans, specs and estimate, and support through construction. The approximately 48-acre Site is a former chemical manufacturing facility that operated from 1927 to 1997 in the Tacoma Tideflats, adjacent to the Hylebos Waterway in Tacoma, Washington (Figure 1). All directions called out in this report will be referenced to the Site specified directions depicted on Figure 1. The addresses for the Site are 2901 and 2920 Taylor Way, Tacoma, Washington. The Site is bounded by the former United States Gypsum (USG) facility to the north (i.e., Site north), the Hylebos Waterway to the east, the Arkema Mound site to the south, and Taylor Way to the west. The proposed barrier wall alignment is shown on Figure 2, along with other pertinent existing site conditions. Last Day to Submit Questions October 6, 2023 @ 2:00 PM (PST) *Review/Shortlist* OCTOBER 26, 2023 Interviews (if required) * OCTOBER 26, 2023 Final Selection* OCTOBER 31, 2023 Execute Contract* NOVEMBER 7, 2003

Conceptual

Municipal

$1,116,805.00

Public - City

Outdoor Lighting, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
69
Bidding Soon
1,487
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2023

Project location map

2901 Taylor Way, Tacoma, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.