BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Ware, Massachusetts. Completed plans call for the renovation of a water / sewer project.

Bid Result - METAL WINDOWS FILED - Greenfield Glass Co - $ 50,707 HVAC FILED - Royal Steam Heater Group - $208,000 ELECTRICAL WORK FILED - Industrial Technical - $155,000 The work consists of replacing an existing influent comminutor with a new Headworks Screenings Removal System consisting of a mechanical screen, screenings sluice, washer compactor, and all necessary controls systems and appurtenances for a complete system to be installed within the existing influent channel. The project includes a new structural operating platform to support the Screenings Removal System, enclosure of the space with architectural panels, and associated HVAC and electrical upgrades to support the project . All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineer via the Tighe & Bond website Question Deadline 11/12/2023 The Work includes the following major items: a. Demolition of existing influent comminutor b. New Headworks Screenings Removal System consisting of a mechanical screen, screenings sluice, washer compactor, and all necessary controls systems and appurtenances for a complete system to be installed within the existing influent channel c. Structural modifications to the influent channel d. New Structural Operating Platform to support the new Headworks Screenings Removal System e. Replacement of existing isolation gate between the two wet wells and emergency bypass sluice gate. f. Enclosure of the Headworks Room structure at ground level with architectural panels. g. HVAC and electrical upgrades The work consists of improvements to the Headworks of the Water Pollution Control Plant (WPCP) to address ongoing ragging issues that occur within the mechanical equipment throughout the WPCP. The following is a summary of the major work items, organized by subtrade: i. Mechanical/Process 1. Replacement of the existing comminutor with a mechanical cleaned fine scree and washer compactor for removal of screenings and transport to grade for disposal. 2. Upgrade of ancillary systems needed for the operation of the fine screen and washer compactor 3. Replacement of gates used to direct flow around the influent channels and wetwells. ii. Structural/Architectural 1. Construction of a mid-height operating platform within the Headworks Area to support the new process equipment. 2. Enclosure of the above ground Headworks Area to protect mechanical equipment from weather conditions. 3. Structural repairs to the existing concrete channels and wetwells, as needed. iii. HVAC 1. Replacement of existing Exhaust Fan for the Headworks Room 2. Installation of Heating and Ventilation systems to condition the new enclosed space. 3. Gas Detection and Warning Systems iv. Electrical 1. Installation of electrical systems to facilitate the new mechanical and HVAC equipment. 2. Replacement of light fixtures within the Headworks Area.

Award

Water / Sewer

$413,707.00

Public - City

Renovation

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
674
Active Projects
404
Bidding Soon
5,318
All Active Projects
2,206
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 21, 2023

January 22, 2024

November 17, 2024

img_map_placeholder

30 Robbins Rd, Ware, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.