BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Monticello, Minnesota. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The selected consultant must provide all professional engineering services needed to design and prepare final drawings and specifications, administer bids, and administer construction of a new water treatment plant as outlined below, and as otherwise noted within the remainder of this RFP. The City of Monticello proposes to construct a new 10 million gallon per day (MGD) iron and manganese Water Treatment Plant (WTP). The construction of this facility also requires the extension of raw watermains as identified in the feasibility study. In 2020, the City has completed a Feasibility Study for the purpose of selecting the preferred WTP site, developing WTP project including the selection of treatment processes, developing floor and site plans, and preparing preliminary cost estimates. The improvements will also include a new telemetry system to communicate with an existing telemetry system serving other City facilities. The City anticipates selection of a firm will be completed by November 27, 2023. Following the notification of the selected firm, the City expects a contract will be executed between both parties following the November 27th meeting of the City Council. The contract term will start after City Council approval and is expected to end with warranty inspection 2 years after construction completion and acceptance. A bid date for this project is scheduled for Spring of 2025 with construction expected to start summer/fall of 2025 and to be complete by FALL of 2027. Submit Proposal - October 27, 2023 City Council Approves Selected Firm - November 2023 Notice to Proceed / Project Kick-off - November 2023 Final Plans and Specifications - November 2024 City Council Approves Plans and Specifications, Authorize Bids - December 2024 Bid Opening - February 2025 City Council Accepts Bids and Awards Contract - January 2025 Issue Notice to Proceed - April 2025 Begin Construction - May 2025 Substantial Completion - November 2026 The City reserves the right to retain all proposals submitted and to use any ideas in the proposal regardless of whether that proposal is selected. Submission of a proposal indicates acceptance by the firm of the conditions contained in this request for proposals, unless clearly and specifically noted in the proposal submitted and confirmed in the contract between the City and the firm selected. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$530,000.00

Public - City

New Construction, Site Work

21

9

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
83
Bidding Soon
747
All Active Projects
301
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

img_map_placeholder

To Be Determined, Monticello, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.