Published November 16, 2023 at 7:00 PM

Updated January 27, 2024

Site work, paving and renovation of a mixed-use development in Rock Rapids, Iowa. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the renovation of a educational facility.

The work under the Contract shall be commenced on or before a date to be specified in the Contract or written Notice to Proceed of the Owner, and shall achieve Substantial Completion by the following dates for the following phases: 1. Bid Package A - Bus Barn: a. Start: Around April 15, 2024 b. Substantial Completion: October 1, 2024 2. Bid Package B - Pedestrian Bridge Repairs: a. Start: Around May 6, 2024 b. Substantial Completion: August 16, 2024 The successful Bidder will be required to furnish a PerformanceBondandLabor and Material Payment Bond in an amount equal to onehundredpercent(100%) of the Contract Sum, issued by a responsible Surety approvedbytheDistrict and shall guarantee the faithful performance of the Contract andtermsand conditions therein contained and the maintenance of saidimprovementspursuant to the provisions of the Contract Document. Bid Securityshall bemade payable to Central Lyon Community School District, RockRapids, IA The Central Lyon Community School District, reserves theright toreject anyor all bids, re-advertise for new bids, and to waive informalities that maybeinthe best interest of the Central Lyon Community School District. Each Bid shall be made on a form furnished by the Architect, andmust beaccompanied by a certified check or cashier's check drawn onanIowabank, orBid Bond to be executed by corporation authorized to contract asasuretyintheState of Iowa, in the amount equal to five percent (5%) of theamount of theBid,made payable to the Central Lyon Community School District, RockRapids, IA and may be cashed by the District as liquidated damagesintheevent that the successful bidder fails to enter into a Contract andfileabondsatisfactory to the District assuring the faithful fulfillment of theContract andmaintenance of said improvements as required by the law, theprovisionsof thisNotice and Contract Documents within (10) days after acceptanceof thelowestresponsive, responsible bid. All bids shall be sealed and plainly marked. Anyalteration of the Bid Form may be cause for rejection of the bid. State Sales Tax: This project is tax exempt. Do Not include StateSalesTaxinany calculation of Bid totals. Contractor will be provided with Iowasalestaxexemption number for this project. The Central Lyon Community School District, reserves theright toreject anyor all bids, re-advertise for new bids, and to waive informalities that maybeinthe best interest of the Central Lyon Community School District. Monthly estimates will be paid to the Contractor as the work progressesinamounts equal to ninety-five percent (95%) of the Contract valueof theworkcompleted during the preceding calendar month, including theactual cost (exclusive of overhead or profit to the Contractor) of materials andequipment of a permanent nature to be incorporated in the work and delivered to and stored at the job site. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work, partially or totally completed. Final payment of the five percent (5%) due each Contractor will be made upon final acceptance of the work under the respective Contract by the District, and after receipt of satisfactory evidence that all claims pertaining to such Contract have been paid in full as provided in the Contract Document for said work. Project Location: Bid Package A - Bus Barn "Hairpin" Site Rock Rapids, Iowa 51246 Bid Package B - Pedestrian Bridge Repairs Central Lyon School 1010 South Greene Street Rock Rapids, Iowa 51246

Post-Bid

Educational

$900,000.00

Public - City

Paving, Renovation, Site Work

26

25

13

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Manufacturer Qualifications, Field Samples, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Structural Panels, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Fuel-Fired Heaters, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
13
Bidding Soon
201
All Active Projects
80
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2023

April 15, 2024

img_map_placeholder

Multiple Locations, Rock Rapids, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.