Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 21, 2023 at 8:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Mountain View, California. Contact the soliciting agency for additional information.
The Electric Arc Shock Tube (EAST) facility at NASA Ames performs, among other things, spectroscopic measurements in the Vacuum Ultraviolet. This requires the use of specially fabricated crystal windows that are transparent to Vacuum Ultraviolet radiation. These windows are exposed to shock waves of several atmospheres and thousands of degrees for very short (<1 ms) durations. The windows become damaged during this process and must be periodically replaced. There are two materials which meet our transparency requirements down to 120 nm, Magnesium Fluoride (MgF2) and Lithium Fluoride (LiF). Though we have tested with both types of windows in the past, the MgF2 is preferred due to higher cracking resistance and generally lower fabrication and material cost. The form factors for these windows are as specified in NASA drawing number A329-0802-M47. The drawing also specifies machining tolerances and optical performance metrics. The vendor shall verify optical performance prior to delivery of the components. The material is to be optical quality, vacuum ultraviolet grade MgF2. Parts must be free of color centers. The window must be fabricated perpendicular to its optical axis to minimize birefringence and transmission polarization. The table below specifies the minimum transmittance as a function of wavelength. The transmittance should be verified on parts of full form-factor. Transmittance of fabricated windows will be measured by NASA after receipt. Windows not meeting specification will be returned for replacement or full refund, up to 1 year after receipt. f the vendor is unable to meet all of these requirements, in terms of mechanical precision and/or optical quality, relaxed requirements may be considered. In this case, the vendor must provide alternate values for the specifications they are unable to meet. Quantity Because the windows are fabricated from a larger crystal the batch size a vendor can produce may vary. Therefore the vendor may choose to quote for the quantity that is most consistent with their abilities, with the number of windows required being between 4-8. If the vendor anticipates producing test pieces that are near or slightly off-spec during fabrication the quote may also specify a price and quantity for these pieces as an optional add-on to the procurement. Criteria for Selection Primarily, the selection will be based on cost per window. However, considerations will be given for i) higher transmittances, ii) time of delivery, iii) ability to meet or exceed machining and optical tolerances, and iv) availability of additional windows. erformance Period Delivery 3 to 4 weeks after receipt of order S hipping Shipped in container with appropriate protective material P lace of Performance Delivered to NASA Ames
Post-Bid
Military
Public - Federal
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 27, 2023
November 27, 2023
Moffett Blvd, Mountain View, CA
Related To This Project
Mountain View, CA
Bid Date: Nov 15 2023
Mountain View, CA
--
Mountain View, CA
Bid Date: Nov 29 2023
Mountain View, CA
Bid Date: Dec 14 2023
Mountain View, CA
--
Mountain View, CA
--
Mountain View, CA
--
Mountain View, CA
--
Mountain View, CA
--
Mountain View, CA
Bid Date: Nov 07 2023
Mountain View, CA
Bid Date: Oct 24 2023
Mountain View, CA
--
Mountain View, CA
Bid Date: Dec 15 2021
Mountain View, CA
--
Mountain View, CA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
