Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Truckee, California. Completed plans call for site work for a bridge / tunnel.
Nevada County County is inviting proposals from qualified firms to provide construction management and inspections services (appropriate professional registration required) with the experience, expertise, and qualifications to provide Construction Management and Inspection Services for the Hirschdale Road Bridges Project. Work may include comprehensive construction management and inspection services with the construction of bridge(s) within Nevada County. The selected Firm will provide construction management, construction inspection services, resident engineer services, and constructability review services and will work under the direction and supervision of the County. Listed below are examples to be provided by the selected Firm. Proposals should describe the approach that the selected Firm would expect to deliver for providing these services. Construction Management and Construction Inspection o Coordinating with utility companies o Monitoring contractor performance and enforcement of all requirements of applicable codes, specifications and contract drawings o Performing field inspection and other quality control activities, including necessary materials testing o Monitoring construction schedules throughout the course of construction o Reviewing working days, contract time and documenting time extensions o Use of the Caltrans Construction Filing System shall be required on all projects unless otherwise approved by the county. o Documentation similar to the Caltrans Local Assistance Procedures Manual (LAPM) Exhibit 16-A, "Weekly Statement of Working Days" will be required in the project file. o Maintaining a daily inspector's report system that records the hours worked by persons and equipment. Detail must be sufficient to permit the review of the contractor's costs of the work in a manner similar to force account. Equipment must be identified sufficiently to enable determination of the applicable rental rates and operator's minimum wage. The narrative portion of the report shall include a description of the contractor's operation and location of work and any other pertinent information. An example of the daily report forms can be found in the Caltrans Construction Manual. o Tracking subcontractor's work. Ensuring contractor submits written request prior to substituting a contractor. o Maintaining well-organized photographic/video records. o Ensuring contractor properly provides for the safety of the workers. o Managing change orders and obtaining required local agency approval. This includes keeping track of contingency money and notifying local agency when 80% of contingency money has been used. If using federal funds a Request of Authorization for additional construction funds will be needed if change orders will exceed authorized amount. This must be done prior to the approval of change order. o Managing submittals and monitor designer's review activities. o Managing claims. o Managing contractor's Request for Information (RFI). Question Deadline 02/22/2024 Direct all inquiries regarding this RFP in writing to: Diana Wilburn Nevada County Purchasing Division 950 Maidu Ave. Suite 129 Nevada City, CA 95959 Phone: (530) 265-1766 Email: diana.wilburn@nevadacountyca.gov.
Post-Bid
Bridges / Tunnels
$4,000,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2024
May 15, 2024
Hirschdale Rd, Truckee, CA
Related To This Project
Truckee, CA
Bid Date: Dec 07 2023
Truckee, CA
Bid Date: Nov 30 2023
Truckee, CA
--
Truckee, CA
--
Truckee, CA
--
Truckee, CA
Bid Date: Feb 06 2024
Truckee, CA
Bid Date: Apr 25 2024
Truckee, CA
Bid Date: Nov 02 2023
Truckee, CA
Bid Date: Jul 21 2022
Truckee, CA
--
Truckee, CA
Bid Date: Apr 01 2022
Truckee, CA
Bid Date: Sep 29 2023
Truckee, CA
Bid Date: Jan 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.