BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Charleston, South Carolina. Completed plans call for the renovation of a educational facility.

The Scope of Work includes but is not limited to Replace temporary walls with permanent walls in rooms in select rooms. Create a permanent wall to create two functional spaces. Ceiling and floor repair shall be included in the plans and specifications. Provide HVAC dedicated to each room to be controlled by temperature within the room. Project Location: 1002 King Street, Charleston SC 29403 Question Deadline 11/02/2023 at 12:00 PM ET . Scope of work includes but is not limited to: The Project: Replace temporary walls with permanent walls in rooms 129A/B, 134A/B, 224 A/B and 226A/B. Create a permanent wall in room 229 to create two functional spaces. New walls shall extend above the ceiling to the deck above. Ceiling and floor repair shall be included in the plans and specifications. B. Improve occupant comfort for each renovated room by providing HVAC dedicated to each room to be controlled by temperature within the room. Determine whether the existing sprinkler system will suffice and if not provide design for new sprinkler system. C. Contractor shall maintain the construction entrances. This shall include (but not necessarily be limited to) grading, filling of ruts and potholes, and maintaining proper drainage. Maintenance of entry gates shall also be the contractor's responsibility. Adjacent public streets, sidewalks, curbs, and parking lots shall be swept, scraped, washed and kept clean daily (more often as necessary) throughout all operations. D. Contractor to schedule his work in accordance with all noise ordinances per the authority having jurisdiction. E. The Fire Alarm shall contract directly with the Owner. (Raceways and conduits by GC.) F. Contractor shall provide a letter accepting all project conditions prior to commencing work. G. Contractor shall install all temporary security fencing and covered entrances as required by OSF on the site safety plan shown in the contract drawings. Contractor may use existing school fencing that is in place to achieve this purpose. Contractor is responsible for the any damages to existing fencing. H. Contractor is responsible for grounds maintenance along the perimeter fence if applicable. I. Contractor shall provide a project specific safety plan prior to mobilization. J. Contractor shall install Owner provided materials: a. if applicable K. Flooring shall be contracted directly with the Owner. Subfloor repair and preparation by GC. L. Security/enclosure fencing and gates shall be contracted directly with the Owner. Raceways and conduits by GC. M. The Commissioning Agent shall contract directly with the Owner

Award

Educational

$721,800.00

Public - County

Renovation

39

15

9

7

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
80
Bidding Soon
890
All Active Projects
413
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 16, 2023

December 18, 2023

August 31, 2024

img_map_placeholder

1002 King St, Charleston, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.