Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Framingham, Massachusetts. Conceptual plans call for the renovation of a educational facility.
This project is included in the City of Framingham 2024-2028 Capital Improvement Program (CIP). As of October 24, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has not been established; however, funding is being allotted to fiscal year 2025. A detailed scope has not yet been released. This request for capital budget funding is for the design of exterior envelope repairs to the King Elementary and Framingham High Schools. These two facilities fall within our long range exterior envelope repair program and have experienced a number of deficiencies and damage throughout the years. This funding request of $322,000 would allow the Department to work with our House Doctor Design to investigate the major areas of concerns, moisture infiltration, extent of damage to the infrastructure, and begin developing a plan for repairs. Once this effort is completed, the Department will have a phased approach and bidding documents to begin the repair process. This project will address many issues at King and FHS, including failing window perimeter sealant systems; deteriorating expansion joints; deteriorating fascia; deteriorated mortar; foundation cracks and failure; spalling concrete; and associated components. King was constructed in 1957 and has undergone numerous improvements throughout the years. However, there have been minimal repairs to the building's exterior envelope, which has resulted in the deteriorating conditions of today. Framingham High School was constructed in 1961 and underwent expansion and renovations from 2001 through 2007. While this building has undergone numerous renovations and repairs, the exterior envelope has not been the focus of repairs or renovations for a number of years. This is shown in the current condition and continued moisture infiltration throughout the building. Estimated Design Costs - King Elementary School - $135,000 Framingham High School - $187,000 Total Requested - $322,000 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Educational
$3,542,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2025
115 A St, Framingham, MA
Related To This Project
Framingham, MA
--
Framingham, MA
--
Framingham, MA
Bid Date: Nov 08 2023
Framingham, MA
Bid Date: Nov 28 2023
Framingham, MA
Bid Date: Nov 29 2023
Framingham, MA
--
Framingham, MA
--
Framingham, MA
--
Framingham, MA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.