Renovation of an educational facility in Aurora, Colorado. Completed plans call for the renovation of a educational facility.

Typical for this type of older construction, steam convectors are installed below most windows and radiate heat when the steam flow is turned on. Temperature control ispoor with a manually adjusted control valve at eachunit. Steam service to this system is activated seasonally and is turned off in the summer. Environmental control is poor and occupant complaints are frequent. Additionally, the old steam and condensate piping is very old and with expected corrosion, leaks are many. Water damage is a frequent problem. Steam distribution in this manner is not a current best practice and should be modernized. This project consolidates the (3) Building 500 East Wing heating water systems into one system. This includes increasing heating water pump and piping capacities, as well as providing new heating water supply and return risers to connect the existing heating water piping in the west wing lower levels. This project also includes an additive alternate for the remaining West wing. All campus standards and project drawing and specifications shall be followed for this project. The project includes removal of steam and hydronic piping, associated insulation, mechanical equipment which includes convectors, steam-to-hot water heat exchangers, pumps, and their controls as shown on the construction drawings. Some piping insulation to be removed could contain asbestos and will be coordinated with the owner. New work includes replacing the heating water pumps and increasing heating water piping sizes to accommodate the combined heating water load. This piping will be extended to the new heating water riser. Additional piping will be enlarged and added as shown on the plans. Sprinkler piping in mechanical rooms and other spaces may need modification to accommodate the new installations. Minimal drywall and ceiling repairs required due to the mechanical scope. The new equipment such as pumps and convectors will be connected to the building automation system. Anticipated General Contractor Start 01/03/2024 Anticipated Construction Start/Finish 03/15/2024-08/15/2024 Question Deadline 11/08/2023 at 2:00 PM MT Date Email Answers Issued 11/13/2023, 2:00 PM

Award

Educational

$1,223,091.00

Public - State/Provincial

Renovation

46

14

2

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
112
Bidding Soon
1,668
All Active Projects
712
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 29, 2023

March 15, 2024

August 15, 2024

img_map_placeholder

13001 E 17th Pl, Aurora, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.