Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 25, 2023 at 8:00 PM
Updated May 4, 2024
This is a service / maintenance or supply contract in Bentley, Alberta. Contact the soliciting agency for additional information.
The Blindman River pumping station has not been operated since 2011 due to high lake levels. The licence for pumping has bee suspended since 2018 due to the risk of introducing Prussian Carp into Gull Lake. AGI requires a hydrology study of Gull Lake that will assess: o The historical effect that pumping has had on the lake in both dry and wet years; o The potential impacts of a variety of pumping scenarios, considering water availability in the Blindman River and Gull Lake levels; and o The costs for the various pumping scenarios that factor electricity, capital and general operations and maintenance. A licence for the stabilization of Gull Lake (00044974-00-00) was issued in 1977 and amended in 1983. Under this licence diversion from the Blindman River to Gull Lake was permitted provided flows for the Blindman River continued to be above 5.0 m3/s. Pumping under this licence continued from 1977 to 2011. From 2011 to 2019 there was no pumping as the Lake was above the pumping trigger elevation. In 2019 Prussian Carp were discovered in the Blindman. The licence was suspended due to concerns for the possibility of Prussian Carp entering Gull Lake through the pumping system. AGI is in the process of gathering information to support a regulatory application to lift the licence suspension. This study will form one of the required components to support the application. The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed