BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work and paving for a road / highway in Wenatchee, Washington. Design plans call for site work for a road / highway; and for paving for a road / highway.

This project is funded by WSDOT through the Connection Washington program. This project provides for safety and mobility improvements along Wenatchee Avenue between Walnut/Hawley and Horselake Rd. As of July 24, 2025, this project is in the 2024 Capital Budget. A design firm has already been selected and it is in the design phase. Construction is expected in 2026. The City of Wenatchee invites consulting firms with expertise in providing civil engineering professional services in the areas of design, architecture, permitting, public involvement, right-of-way acquisition, engineering, and construction management to submit their qualifications for developing the North Wenatchee Avenue Corridor Improvements Project.

Design

Roads / Highways

$11,210,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
7
Bidding Soon
316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.