BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2024 at 8:00 PM

Updated August 27, 2024

Site work for a water / sewer project in Wenatchee, Washington. Completed plans call for site work for a water / sewer project.

The Eastbank Aquifer wellfield has four pumps. Pump No. 2 is the most used of the pumps and works in tandem with the smaller pumps to ensure the Regional partners can meet peak water demands. The pump was installed in the early 1970s. This project will replace the pump and motor and will require improvements to the pump house, pump platform and electrical system. As of August 26, 2024, this project has already begun.

Under Construction

Water / Sewer

$1,050,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
10
Bidding Soon
309
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2024

Project location map

To Be Determined, Wenatchee, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.