BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 16, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a mixed-use development in Wenatchee, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

AC Water Main Replacement Projects Site Directions: Multiple roadway locations throughout Wenatchee Installation of new water mains and abandonment of existing Asbestos Cement water mains. Existing water lines and services will be replaced in 1st Street from Wilson to Miller and in Chelan Ave. from Marr to Lincoln. A new water main will be constructed in 8th Street between Miller and Wilson including new hydrants and services. Roadways will be repaved and ADA compliant pedestrian ramps will be built in accordance with the plans and specifications. The project cost is estimated between $1,100,000, and $1,300,000. Work to be performed includes: Installation of approximately 375 feet of 6-inch ductile iron water mains, approximately 1,650 feet of 8-inch ductile iron water mains, replacement or reconnection of 11 customer water services, installation of 28 water services, removal and disposal of 320 feet of 6-inch asbestos-cement pipe, grout filling in-place of 400 feet of 8-inch asbestos cement pipe and 220 feet of 6-inch steel pipe; installation of 9 ADA sidewalk ramps, installation of 5 catch basins, and grinding and overlaying the work areas. Work on existing asbestos-cement pipe will require personnel with proper certifications. PROJECT LOCATION There are three locations on this project: o First Street from North Miller Street to North Wilson Street. o Intersection of South Chelan Avenue and Marr Street. o 8th Street from Ramona Avenue to North Miller Street. Questions regarding the project should be addressed to: Jeremy Hoover, PE City of Wenatchee Phone: (509) 888-3212 Email: jhoover@wenatcheewa.gov Each request for such interpretation should be by email or in writing addressed to City of Wenatchee, 301 Yakima Street, Wenatchee, Washington 98807.

Bid Results

Water / Sewer

$1,213,016.00

Public - City

Paving, Site Work

33

7

12

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
7
Bidding Soon
315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2023

April 1, 2024

Project location map

Multiple Locations, Wenatchee, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.