BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

The work in this contract is for the Sanitary Sewer Phase 7 for Malcomson Road Utility District located in Canterbury Forest, Lakeview Village, Lakeview Place and Louetta. The purpose of this project is to improve the conditions of sanitary sewer lines and manholes in the aforementioned locations, improve sanitary sewer flow and reduce sanitary sewer overflows in the area. This project was designed by Lockwood, Andrews & Newnam, Inc. (LAN). The construction phase engineering services on this project will also be conducted by LAN. Any questions regarding the project should be directed to Pablo Bribiesca, E.I.T. or Jake W. Kocurek, P.E. with LAN at (713) 266-6900. In general, this work consists of: Pipe bursting of sanitary sewer lines including service reconnections in kind, drop stack reconnections, and cleanout replacements. Cleaning and preparation of sanitary sewer manholes prior to rehabilitation, including removing existing liners, debris, existing utility cables etc. Repair of sanitary sewer manholes including cementitious lining, removing and replacing frame and cover, raising sanitary sewer manholes, repair of bench and invert, grouting exterior of manhole frames, and removing and relocating pipe and/or cable through sanitary sewer manholes. Contractor shall initiate coordination with pipe and/or cable owner within 30 days of notice to proceed and provide proof of ongoing communication throughout the project at a frequency of at least once every 30 days until completed. Coordinating with District Operations Staff and Engineer to reduce and maintain flow from lift stations into the sanitary sewer system in order for rehabilitation work to be performed. Site restoration including removing and replacing concrete sidewalks and pavement including driveways, roadways, curb, gutter, damaged turf, plants, shrubs, fences, and trees, as required. Implementation and maintenance of traffic control when necessary or required. Contractor to note that these plans may not include all necessary Traffic Control Plans. Contractor to ensure traffic control is executed as necessary to facilitate work. Performing trench safety as required per Section 01561.

Bid Results

Water / Sewer

$529,970.00

Public - County

Site Work

12

13

7

5

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
78
Bidding Soon
2,766
All Active Projects
979
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2023

December 14, 2023

img_map_placeholder

Multiple Locations, Houston, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.