BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 28, 2023 at 7:00 PM

Updated January 27, 2024

Renovation of an educational facility in Brandon, Manitoba. Completed plans call for the renovation of a 43,500-square-foot, 11-story above grade educational facility.

Renovation to 80 Suites, and select common areas in McMaster Hall at Brandon University, New backup generator, and upgrades to fire alarm systems. Ben Wiebe Construction, as designated Prime Contractor, will co-ordinate sub-trades to complete the project as laid out in the attached drawings and specifications. Each trade to supply and install materials and labour specific to their trade as specified in the MasterFormat Divisions and itemized in the attached trade inclusions list and detailed in the attached specifications. *Tender for sub trads has closed. Submissions will not be disclosed.

Bid Results

Educational

Public - City

Renovation

48

27

11

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
8
Bidding Soon
129
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2023

December 4, 2023

Project location map

270 18th St, Brandon, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.