Renovation of a municipal facility in Lac La Biche, Alberta. Completed plans call for the renovation of a municipal facility.

Work of the Project, of which Work of this Contract is a part, comprises the following: .1 Demolish the existing heating plant heating pumps, heating boilers, heating piping, valves and accessories within the mechanical room and fire centre building controls in its entirety. .2 Supply, install new heating pumps and heating boilers, heating piping, valves and accessories within the mechanical room and fire centre building controls in its entirety, and make operational the heating plant. .3 Demolish existing unit heater and thermostats. .4 Supply, install make operational new unit heaters and respective thermostats. .5 Asbestos removal and Air Monitoring. .6 Demolish existing 3-way control valves serving Reheat coils and 2-way control valves serving baseboard and existing thermostats. .7 Supply, install make operational new 2-way control valves including piping changes needed for the reheat coil and new 2-way control valves for the baseboard and new thermostats. .8 Demolish existing reheat coils. .9 Supply, install make operational new reheat coils including balancing of all baseboard and reheat coils. .10 Temporary heat shall be provided by the contractor during the entirety of demolition and construction. The building shall be occupied and fully operational throughout the entire process. .11 Rebalancing of all hydronic control valves and balancing valves within the fire center and mechanical room. .12 Rebalancing of all air flows to match new reheat coils being installed in its entirety of the fire center. .13 The replacement of the control valves and reheat coils shall be done while the fire center is operational with no interruption of service. .14 It is the contractor's responsibility to phase the work accordingly to allow the building to operate and be used without interruption. Consideration to provide dates and means and methods on how and when work outside of the mechanical room will be done including but not limited to demo and replacement of reheat coils throughout the fire center as well as control valves for all baseboard and reheat coil zones, including thermostats and controls should be done.

Award

Municipal

$492,000.00

Public - State/Provincial

Renovation

12

23

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
5
Bidding Soon
23
All Active Projects
10
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2023

January 8, 2024

img_map_placeholder

9505 Beaverhill Rd, Lac La Biche, AB

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.