Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 20, 2024 at 8:00 PM

Updated June 21, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Leavenworth, Kansas. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of June 20, 2024, information regarding the award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2026. *The closed solicitation has been included below for reference: Off-System Bridge project 052C-5269-01, which is a two bridge replacement project, including 32' wide structure, sized to pass a minimum of a 50-year storm event and a minimum of 150' of roadway on either side of structure with signing, striping and safety improvements, as needed, on Golden Road between 166 th Street and 189 th Street. Sealed envelopes containing the proposal must be plainly marked on the outside as: Submittal for Leavenworth County Project. Interested consulting firms must be pre-qualified by KDOT in the work categories noted. Leavenworth County is seeking a consultant to provide design services for the Leavenworth County Kansas Local Bridge Improvement Program grant projects for SH-54 and SH-61 bridge replacement projects. The work includes bridge removal and replacement of existing bridge. The removal and replacement that include the following: o Rural Local Structure, 32' wide (24' pavement with 4' shoulders each side) plus barrier. o HL-93 Loading o Designed to KDOT and AASHTO Standard Specification for Highway Bridges. o Structure sized to pass 50-year storm event, minimum. o Designed to Kansas Department of Transportation specifications. o Select the most cost-effective structure with input from Leavenworth County o 32' roadway width (24' pavement with 4' shoulders each side), 55 MPH design speed o Minimum of 150' each side of structure, tapered to match existing road, shoulders may be reduced to match structure, but grading should be performed to allow for future upgrades o Signing, striping, and safety improvements as necessary o Guardrail design (MGS) o Traffic Control plans showing bridge closure and possible detour plan.

Conceptual

Bridges / Tunnels

$1,340,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
79
Bidding Soon
1,357
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

Project location map

Multiple Locations, Leavenworth, KS

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed