Site work for a water / sewer project in Duvall, Washington. Completed plans call for site work for a water / sewer project.
COMPLETION OF WORK: The Work must be completed within 60 working days after the commencement date stated in the Notice to Proceed. Construction is not to begin before April 1, 2024. DESCRIPTION OF WORK: The proposed improvements for the Tolt 2 Transmission Main Rehabilitation Project consists of the replacement of approximately 2,800 LF of existing 10 inch AC water main located along the Tolt 2 pipeline between NE Big Rock Road and Tolt River pipeline. The replacement of the existing main will include the installation of a new 12-inch diameter HDPE pipeline by method of open-cut and approximately 855 LF of horizontal direction drilling (HDD) to mitigate impacts to existing sensitive areas within the project limits. The proposed improvements for this project also include two connections to existing main including one connection by "hot-tap," pavement restoration, and removal and disposal of approximately 450 LF of AC watermain. AWARD: Award will be based on the lowest responsive bid at the City's sole discretion. SITE OF WORK: The Project is located in unincorporated King County, Washington, along the Puget Sound Energy transmission line corridor between NE Big Rock Road and the Tolt River pipeline. BIDS TO REMAIN OPEN: The Bidder shall guarantee the total Bid price for a period of 60 calendar days from the date of Bid opening. PROJECT ADMINISTRATION: All communications relating to the Project shall be directed to the following PROJECT REPRESENTATIVE prior to the opening of the Bids: Gavin Harrold, Project Manager, 14525 Main Street, Duvall, WA 98019; 425-393-8045; email: Gavin.Harrold@duvallwa.gov. All bid proposals must be on the form provided and must be accompanied by Bid security in the form of certified check, cashier's check, or Bid Bond in an amount equal to five percent (5%) of the amount of the Bid proposal. Should the successful Bidder fail to enter into the Agreement and furnish satisfactory performance and payment bonds within the time stated in the Contract Documents, the Bid Security shall be forfeited to the City of Duvall. OWNER'S RIGHTS RESERVED: The City of Duvall reserves the right to reject any or all Bids and to waive informalities in the bidding process. The Agreement will be awarded to the lowest responsive, responsible bidder as it may best serve the interest of the City of Duvall. EQUAL OPPORTUNITY: The City of Duvall is committed to a program of equal employment opportunity regardless of race, color, creed, sex, age, national origin, or the presence of any sensory, mental, or physical disability. Attention is called to Federal provisions for Equal Employment Opportunity, HUD Section 3 requirements, and the minimum wages as set forth in the contract documents. SUPPLEMENTAL RESPONSIBLE BIDDER CRITERIA: Supplemental Responsible Bidder Criteria will apply to this project and are included in the 00100 Instructions to Bidders section, Item 17. In a timely manner, Bidders may request, in writing, that the City modify the supplemental criteria. The City reserves the right to modify or not modify the supplemental criteria in its discretion. The City shall issue an Addendum, prior to the Bid Due Date, should it modify the supplemental criteria. The City shall not modify the supplemental criteria after the Bid Due Date; therefore, Bidders are encouraged to discuss with the project manager immediately, no later than 48 hours before the Bid Due Date, the relevancy of the supplemental bidder criteria. Any bidder determined to be not responsible based on these supplemental criteria may appeal the City's determination by providing additional information to the City within two (2) business days following receipt of the City's written determination that the bidder was determined not responsible.
Bid Results
Water / Sewer
$888,414.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 16, 2023
December 18, 2023
Multiple Locations, Duvall, WA
Related To This Project
Duvall, WA
--
Duvall, WA
Bid Date: Sep 25 2019
Duvall, WA
Bid Date: Apr 02 2024
Duvall, WA
Bid Date: Apr 18 2024
Duvall, WA
Bid Date: May 29 2024
Duvall, WA
--
Duvall, WA
Bid Date: Sep 05 2024
Duvall, WA
--
Duvall, WA
Bid Date: May 31 2022
Duvall, WA
--
Duvall, WA
Bid Date: Nov 28 2023
Duvall, WA
Bid Date: Jun 11 2024
Duvall, WA
Bid Date: May 31 2023
Duvall, WA
Bid Date: Jun 22 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.