Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Aspen, Colorado. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Region: 3 Counties: Pitkin This is a Surface Treatment Project Within Pitkin County, Along Sh 82, With Project Limits Between Mp 26 and Mp 33 and Treatment Limits Between Mp 26.9 and Mp 32. The Work Includes 2" Hma Planing, 2" Hma Overlay, Guardrail Replacement, Bridge Work, Curb Ramp Replacement, Pavement Marking, and Traffic Control. This project is located in Region 3 in Pitkin County. Project work consists of surface treatment along SH 82 from MP 26 and MP 33 to include 2" HMA planing, 2" HMA overlay, guardrail replacement, bridge work, curb and ramp replacement, pavement marking, and traffic control. Please contact Greg Torney at 806-778-0348 for all project questions. Calendar Days: 154 It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 (X) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,0000 Contract UDBE Goal: 6.00% CODOT: 005 - Region 3 - SH 82 Surface Treatment *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$7,750,316.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 30, 2023
April 30, 2024
CO-82, Aspen, CO
Related To This Project
Aspen, CO
--
Aspen, CO
Bid Date: Feb 16 2024
Aspen, CO
Bid Date: Jan 19 2024
Aspen, CO
Bid Date: Jan 31 2024
Aspen, CO
Bid Date: Jun 25 2024
Aspen, CO
Bid Date: Feb 09 2024
Aspen, CO
--
Aspen, CO
Bid Date: Nov 10 2023
Aspen, CO
--
Aspen, CO
--
Aspen, CO
--
Aspen, CO
--
Aspen, CO
Bid Date: Oct 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.