BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2024 at 8:00 PM

Updated March 29, 2024

Site work, paving and new construction of a municipal facility in Angleton, Texas. Design plans call for the construction of a municipal facility; and for site work for a municipal facility.

As of March 28, 2024, a Construction Manager at Risk has not yet been awarded. An architect has been selected, and the drawings are in the schematic stage. A timeline for construction has yet to be announced. *The closed solicitation has been included below for reference: The firms who participate in this RFP process are sometimes referred to as "Respondents," "Construction Manager," and "CMAR". A qualified Construction Manager at Risk will be chosen to work alongside the City's contracted Architect in analyzing current proposed designs, providing value engineering suggestions, developing cost estimates, sub-contractor bidding/negotiations services, and potentially as the General Contractor during the project's construction phase. The Construction Manager at Risk will be expected to work closely with the Architect as the cost estimator, project scheduler, and proposer of phasing alternatives for the project upon completion of plans sufficient to estimate the project. The final contract negotiated with the Construction Manager at Risk will determine details related to a contractual guaranteed maximum price for the project. All cost estimation by the Construction Manager at Risk will include full Construction costs. Questions relating to this RFP should be directed to Martha Eighme at meighme@angleton.tx.us with the City of Angleton and Brent Bowles at bbowles@iadarchitects.com with Integrated Architecture & Design. questions/clarifications from prospective respondents is Wednesday, 13 November 15, 2023, at 12:00 p.m. local time. The anticipated Construction Cost Limitation of Estimated $3,900,000.00 - $4,500,000.00 The City of Angleton is soliciting proposals(RFP) for the RFP No. 2023-09 Construction Manager at Risk project for the King Municipal Operations Center. The city reserves the right to negotiate with any and all who submit responses. Questions relating to this RFP should be directed to Martha Eighme at meighme@angleton.tx.us or Brent Bowles at bbowles@iadarchitects.com. Refer to proposal documents for instructions. Proposals received after this time will not be accepted.

Design

Municipal

$4,500,000.00

Public - City

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
317
Active Projects
160
Bidding Soon
3,195
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2023

August 26, 2024

Project location map

To Be Determined, Angleton, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.