BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Assumption, Illinois. Completed plans call for site work for a water / sewer project.

As of December 5, 2023 , this project has not yet been awarded. The project is expected to be awarded on December 6, 2023. Construction of: Baxmeyer Subdivision: Division. UStorm Sewer &. Site Earthwork Division 2: Sanitary Sewer installation Division 3: Potable Water System Install Assistance Division 4: Roadway & Final Site Grading Bid security in the form of a bid bond or bank cashieris check in an amount equal to five percent (5%), of the base bid is required from all bidders. Guaranty bonds in the form of a Performance Bond and a Labor and Material Payment Bond in an amount equal to one hundred percent (100%), of each bid will be required from the awarded bidders.

Award

Water / Sewer

$28,400.00

Public - City

Site Work

17

4

2

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
78
Bidding Soon
1,241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2023

December 29, 2023

Project location map

409 S. BUSINESS 51, Assumption, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.