BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2023 at 7:00 PM

Updated January 27, 2024

Renovation of a mixed-use development in Justin, Texas. Completed plans call for the renovation of a day care center.

The District shall select, via a two-step method, Request for Qualifications (RFQ) for Construction Manager at Risk for Replacement of Prairie View Elementary School and New Early Childhood Center #4. Questions Deadline: 11/6/2023 02:00 PM (CT). The selected Construction Manager is to assist the District and selected Architect with cost evaluations (value engineering), constructability reviews and scheduling during the construction documents phase, and to oversee the progress of the project, documentation, verification and implementation of all subcontractors. To ensure at minimum all subcontractors adhere to current Davis Bacon Prevailing Wages. If the Construction Manager at Risk elects to perform any portion of the scope of work with its own forces, that portion of work shall follow the same proposal procedures as established for all sub-contracted work. In addition to the requested information, organizations submitting may provide supplementary materials further describing their capabilities and experience and their approach to meeting the aggressive construction schedule. Supplemental materials can be submitted as attachments to the electronic submission. Any solicitation and subsequent contract for the construction, rehabilitation, alteration, or repair of a facility in excess of $25,000.00 will require a payment bond. Any solicitation and subsequent contract for the construction, rehabilitation alteration, or repair of a facility in excess of $100,000.00 will require a performance bond. Scope of Work is 105,000 sq. ft re-site of prototype and 60,000sq. ft new design on current Prairie View Elementary School Site, location is current Prairie View Elementary School Site. Project: Prairie View Elementary School 03/01/24 through 06/01/26 New Early Childhood Center f#4 08/01/026 through 06/01/27 5. CONSTRUCTION BUDGET Estimated Budget Total: Prairie View Elementary School - $51,814,213 Early Childhood Center #4 - approximately $31,000,000

Post-Bid

Educational

$2,000,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
172
Bidding Soon
3,779
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.