Demolition, site work and addition to a municipal facility in Bowling Green, Ohio. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; and for site work for a municipal facility.

As of December 6, 2024, a design/build firm was awarded. Construction began May 6, 2024 and is anticipated to end April 25, 2025. *The closed solicitation has been included below for reference: Bowling Green State University ("the Owner") requests interested firms to submit qualifications for full comprehensive Design-Build (DB) services for a renovation to add additional residence rooms within the lower level of Kohl Hall. Kohl Hall is a 68,000 sq.ft., four story residence hall, built in 1938 with a substantial addition in 1962, it sits on south edge of campus at the intersection of West Wooster Street and South College Drive. The project consists of expanding the residence rooms to the original building's lower level, adding approximately 40 beds, pod style restrooms, and community space. The project will also be responsible for demolition of existing office space and the relocation of select buildingwide services, such as a residence use kitchenette, to the lower level addition. Additional related scope within Kohl Hall may be added to this contract as required by BGSU. The project will run concurrent to the BGSU McDonald and Kohl Hall Air Conditioning project, also a Design-Build project lead by BGSU Project Manager Bob Boucher and Gilbane Building Company. Both projects will begin work within Kohl Hall starting Summer 2024 and complete no later than May 2025. The Program of Requirements ("POR") will be developed as a part of this project from the BGSU University Design Standards as provided by BGSU Campus Construction acting as the Criteria Architect/Engineer ("Criteria A/E"). All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owner's policies and procedures. The selected Design-Builder ("DB"), as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement detailed cost components, to address the Owner's project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. Total Project Cost $3,000,000 Construction Cost $2,400,000 DB Preconstruction Services Start 01 / 24 Construction Stage Notice to Proceed 05 / 24 Substantial Completion of all Work 04 / 25 DB Services Completed 07 / 25 Percent of the DB's total compensation excluding DB's Contingency* 5.0% *Preconstruction Stage Compensation plus Contract Sum minus DB's Contingency Questions will be answered and posted to the Opportunities page on the OFCC website at electronically . The Contracting Authority reserves the right to reject all proposals and cancel at any time for any reason this solicitation, any portion of this solicitation or any phase of the Project. The Contracting Authority shall have no liability to any proposer arising out of such cancellation or rejection. The Contracting Authority reserves the right to waive minor variations in the selection process.

Under Construction

Municipal

$3,000,000.00

Public - State/Provincial

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
46
Bidding Soon
898
All Active Projects
364
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2023

May 6, 2024

img_map_placeholder

921 E Wooster St, Bowling Green, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.