BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2025 at 8:00 PM

Updated August 23, 2025

Site work for a civil project in Drumheller, Alberta. Design plans call for site work for a bridge / tunnel; and water / sewer project.

Rehabilitation of the existing Hwy 838 Michichi Creek bridge (BF 8584) and Michichi Creek (BF 8584A) flood protection timber wall. The project is located along Hwy 838/ North Dinosaur Trail within the Town of Drumheller approximately 300m west of the Hwy 9/Hwy 838 intersection. (Lat 51.4714 Long -112.7167). The project involves two components: Replacement Existing Michichi Creek Hwy 838 Bridge Structure (08584); and Michichi Creek Flood Wall Rehabilitation (8584A). TIMELINE: Conceptual design has concluded. Construction is expected in 2027 or later, depending on funding availability. *Budget is unreleased.

Design

Bridges / Tunnels

$2,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
0
Bidding Soon
88
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2027

Project location map

Michichi Dr, Drumheller, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.