BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Bristol, Connecticut. Completed plans call for the renovation of a educational facility.

Building Management System Upgrades at Bristol Schoolsv The City of Bristol is seeking proposals for the upgrade of building management systems to the latest revision of the Schneider EcoStruxure environment at five of its school facilities, through the use of funding via the Elementary and Secondary School Emergency Relief Fund ("ESSER II Fund"). Questions regarding this document should be referred to Roger D. Rousseau at (860) 584-6195 or at rogerrousseau@bristolct.gov. 3. SCOPE OF SERVICES The selected vendor must be a certified EcoXpert, and a designer of the Schneider Electric family of products branded Invensys, Barber Colman, Siebe, and Robertshaw, and must possess the programming and software tools required to commission and maintain these controllers. Only proposals from authorized suppliers of EcoStruxure will be considered. EcoStruxure Front End Existing SNE Building Systems/Schneider Electric Front End shall remain and the existing software upgraded to the latest revision. All schools shall be seamlessly integrated into the existing front end without the need for a third-party integrator. All new unitary controllers shall be Schneider Electric SmartX MP-C series, MP-V series, and/or RP-C series BACnet/IP controllers (no exceptions). Scope of Work Common to Each School Retain the existing Schneider Electric Automation Server (ASP) and upgrade the software to the latest revision. Remove existing Barber Colman, TAC and Invensys controllers and replace them with new Schneider Electric IP controllers. Retain all existing control end devices and terminate all existing control end device wiring on new controllers. Install new Cat 5/6 control bus daisy-chained between existing Schneider Electric ASP and all new IP controllers. Upgrade existing dynamic color graphics to HTML. Provide all upgrade programming, sequences of operation to match existing and integrate with existing SNE Building Systems/Schneider Electric EcoStruxure Front End. Select balancing for outdoor air and VAV Boxes. Check, Test and Commission all controllers and control devices. Provide a list of any control end devices in need of repair and/or replacement. Scope of Work Associated with Controller Upgrade - Device Counts Ivy Drive Elementary School 25 - Schneider TAC Invensys MNL-800 Lon Mountain View Elementary School 15 - Schneider TAC Invensys MNL-800 Lon 7 - Schneider TAC Invensys MNL-200 Lon Bristol Central High School 49 - Schneider Electric Network 8000 Microzone ASD 20 - Schneider Electric Network 8000 Microflo ASD 6 - Schneider Electric Network 8000 PEM ASD Bristol Eastern High School 50 - Schneider Electric Network 8000 Microzone ASD 17 - Schneider Electric Network 8000 Microflo ASD 8 - Schneider Electric Network 8000 PEM ASD Chippens Hill Middle School 14 - Schneider Barber Colman Network 8000 Microzone ASD All pneumatic control devices shall be removed and replaced with Schneider Electric EcoStruxure DDC controllers. All valve actuators, damper actuators and sensors on the equipment listed below shall be integrated with the buildings DDC system. Boiler controls and mixing valve Air handler unit controls Fan coil unit controls Radiation control valves Thermostats Day night controls Cabinet unit heater controls Unit heater controls Exhaust fan controls

Post-Bid

Educational

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
478
Active Projects
280
Bidding Soon
4,472
All Active Projects
1,913
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2023

December 27, 2023

img_map_placeholder

Multiple Locations, Bristol, CT


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.