BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Roanoke, Virginia. Working plans call for the renovation of a detention facility.

As of January 12,2024, no bids received. Replace existing HVAC equipment and replacement of existing roofing with new single-ply TPO membrane roof and associated work. Bids shall be prepared on a single-prime, lump sum basis. Questions should be submitted in writing to build@spectrumpc.com on the Pre-Bid Question form included in the Specification. For additional information contact: Owner Mr. Bryan Henry, Superintendent Roanoke Valley Juvenile Detention Center Email: bhenry@rvjdc.org Architect / Engineer Jackie Mayrosh PE, Project Manager Spectrum Design, PC jmayrosh@spectrumpc.com Construct the Work in phases as indicated. 1. HVAC Replacement: a. HVAC replacement shall occur prior to re-roofing: b. Building is served by five rooftop HVAC units as follows: Unit 1: Administrative Area, Housing Unit A, Housing Unit B Unit 2: Housing Unit C, Housing Unit D Unit 3: Housing Unit E, Housing Unit F Unit 4: Gymnasium Unit 5: Kitchen, Laundry c. HVAC Replacement work shall be phased. Sequence to be determined by the Contractor based on the following. 1) Unit 1, Unit 2, and Unit 3 work must be performed in separate phases. A minimum of four Housing Units must be fully conditioned and operational at all times. 2) Unit 4 work can be combined with any other phase. 3) Unit 5 work can be combined with any other phase however the Kitchen and Laundry can be without HVAC a maximum of 15 days. d. Coordinate sequence of areas with Owner. The building will be occupied by residents and must remain conditioned in occupied living areas. e. Allow a minimum of seven days between phases for Owner to transition residents between Housing Units. f. Provide temporary roof repair at new roof top curbs to maintain weathertight condition until roof replacement occurs. 2. Roof Replacement can occur after HVAC replacement or simultaneously. a. Provide schedule for roofing such that Owner can coordinate resident activities in affected areas.

Final Planning

Jails / Prisons

$5,800,000.00

Public - City

Renovation

33

15

9

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
28
Bidding Soon
344
All Active Projects
139
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2024

July 11, 2024

img_map_placeholder

498 Coyner Springs Rd, Roanoke, VA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.