Published January 12, 2024 at 7:00 PM
Updated January 29, 2024
Renovation of a detention facility in Roanoke, Virginia. Working plans call for the renovation of a detention facility.
As of January 12,2024, no bids received. Replace existing HVAC equipment and replacement of existing roofing with new single-ply TPO membrane roof and associated work. Bids shall be prepared on a single-prime, lump sum basis. Questions should be submitted in writing to build@spectrumpc.com on the Pre-Bid Question form included in the Specification. For additional information contact: Owner Mr. Bryan Henry, Superintendent Roanoke Valley Juvenile Detention Center Email: bhenry@rvjdc.org Architect / Engineer Jackie Mayrosh PE, Project Manager Spectrum Design, PC jmayrosh@spectrumpc.com Construct the Work in phases as indicated. 1. HVAC Replacement: a. HVAC replacement shall occur prior to re-roofing: b. Building is served by five rooftop HVAC units as follows: Unit 1: Administrative Area, Housing Unit A, Housing Unit B Unit 2: Housing Unit C, Housing Unit D Unit 3: Housing Unit E, Housing Unit F Unit 4: Gymnasium Unit 5: Kitchen, Laundry c. HVAC Replacement work shall be phased. Sequence to be determined by the Contractor based on the following. 1) Unit 1, Unit 2, and Unit 3 work must be performed in separate phases. A minimum of four Housing Units must be fully conditioned and operational at all times. 2) Unit 4 work can be combined with any other phase. 3) Unit 5 work can be combined with any other phase however the Kitchen and Laundry can be without HVAC a maximum of 15 days. d. Coordinate sequence of areas with Owner. The building will be occupied by residents and must remain conditioned in occupied living areas. e. Allow a minimum of seven days between phases for Owner to transition residents between Housing Units. f. Provide temporary roof repair at new roof top curbs to maintain weathertight condition until roof replacement occurs. 2. Roof Replacement can occur after HVAC replacement or simultaneously. a. Provide schedule for roofing such that Owner can coordinate resident activities in affected areas.
Final Planning
Jails / Prisons
$5,800,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.