Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 27, 2023 at 7:00 PM

Updated January 29, 2024

Site work for a bridge / tunnel in Hazelton Township, Minnesota. Completed plans call for site work for a bridge / tunnel.

LOCATION AND TYPE OF WORK: Farm Island Township Culvert Replacement on 420th Ave Approximate major items of work are: AGGREGATE SURFACING (LV), CLASS 5, CY 302 SILT FENCE, TYPE HI, LF 505 TURF ESTABLISHMENT, LS 1 16X6 PRECAST CONCRETE BOX CULVERT, LF 38 STRUCTURE EXCAVATION CLASS U (P), CY 422 TRAFFIC CONTROL, LS 1 Farm Island Twp Culvert Replacement on 420th Ave Expected Award Date:12/04/2023 Project Start Date:12/13/2023 Construction Start Date:12/14/2023 Construction End Date:09/01/2024 The County reserves the right to reject any or all bids and to waive any irregularities thereof.

Award

Bridges / Tunnels

$202,272.00

Public - County

Site Work

16

8

4

5

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
17
Bidding Soon
359
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2023

January 3, 2024

Project location map

420th Ave, Hazelton Township, MN


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed