Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 27, 2023 at 7:00 PM

Updated January 29, 2024

Site work and paving for a bridge / tunnel in Marion, North Carolina. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This work shall consist of furnishing all labor, equipment, and materials to overlay the existing bridge deck with latex modified concrete overlay, repair substructure, repair reinforced concrete diaphragms and deck girders, as directed in the plans. Work includes: portable lighting; existing bridge deck surface preparation by scarification and hydro-demolition the existing bridge deck; overlaying the prepared bridge deck with latex modified concrete; installation of elastomeric concrete joint headers and foam joint seals; grooving bridge deck; bridge jacking and reinforced concrete deck girder repairs, epoxy coating girders; substructure repair using concrete, shotcrete, and epoxy coating top of caps and struts; disposal of demolition and waste material; approach pavement milling and paving; seeding and mulching all grassed areas disturbed; and all incidental items necessary to complete the project as specified and shown on the plans. No separate measurement or payment will be made for seeding, mulching, or any measures required to control erosion or prevent off-site sedimentation. The cost of this work shall be included in the lump sum price bid for Mobilization. Questions should be emailed 7 calendar days prior to the bid opening to Dan Johnson at dpjohnson1@ncdot.gov. Contract Id DM00373 County: McDowell The North Carolina Department of Transportation is requesting bids for bridge preservation, bridge number 32 on US-70 over Commerce Street, Norfolk Southern Railroad, and Mill Creek in McDowell County Firms that wish to bid on these projects as the prime contractor must be prequalified prior to submitting your bid. Firms that wish to perform as a subcontractor to the prime contractor must be prequalified prior to beginning work on the project. The availability date for this project is January 15, 2024. The completion date for this project is September 27, 2024. NCDOT - Bridge Preservation, Bridge Number 32

Award

Bridges / Tunnels

$1,612,790.00

Public - State/Provincial

Paving, Site Work

43

3

8

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
134
Bidding Soon
1,905
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2023

January 15, 2024

Project location map

US-70, Marion, NC


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed