BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2024 at 7:00 PM

Updated February 6, 2024

Site work, paving and new construction of a mixed-use development in Windom, Minnesota. Completed plans call for the construction of a 38,684-square-foot, one-story above grade municipal facility; for site work for a municipal facility; and for paving for a municipal facility.

New 38,684 SF County Maintenance facility located on County Road 15 near Windom, MN. The new facility will include county and works offices, a repair bay and wash bay, and an area for maintenance vehicle storay. The building in a one-story building with two mezzanines. The maintenance building is sprinklered. The work will be accomplished through multiple contracts with Cottonwood County, with Contegrity Group Inc. acting as the Construction Manager. The following categories of work will be bid (subject to change): Earthwork/Utilities, Exterior Improvements, Concrete, Polished Concrete, Precast Concrete, Masonry, Structural Steel Erection, Carpentry, Casework, Roofing, Overhead Doors, Aluminum Frame & Glazing, Gypsum Board, Tile, Acoustical Treatments, Flooring, Painting, Salt Shed, Cold Storage/Salt Shed Roof, Fire Protection, Mechanical/Plumbing, HVAC, Controls, Testing/Adjusting & Balancing, and Electrical/Communication/Electronic Safety and Security. Material Only Categories: Steel Supply, Standard Doors/Frames/Hardware & Specialties. If awarded a contract, each successful Bidder with a contract value of $175,000.00 or more shall be required to furnish both Performance and Payment Bonds covering faithful performance of the contract and the payment of all obligations arising under such contract. Such bonds shall be the latest edition of the AIA Document A312/CM, in the amount equal to 100% payment. Cottonwood County reserves the right to reject any or all bids received and to waive any informalities and irregularities in the bidding. Bids may not be withdrawn or modified within forty-five (45) days after the closing time and date. As of December 27, 2023,an awarded general contractor and sub trades have been identified. Construction is expected to start mid-May 2024. Completion is expected mid-June 2025.

Award

Municipal

$9,300,000.00

Public - County

New Construction, Paving, Site Work

152

34

79

2

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
41
Bidding Soon
328
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2023

April 15, 2024

Project location map

46705 Co Rd 15, Windom, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.