Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2024 at 8:00 PM

Updated April 11, 2024

Site work for a bridge / tunnel in Windom, Minnesota. Completed plans call for site work for a bridge / tunnel.

Type Of Work: Box Culvert Major Items: 2021.501/00010 Mobilization Ls 2104.503/00255 Remove Pipe Culverts L F 2106.507/00130 Common Embankment (Cv) C Y 2211.509/00010 Aggregate Base Class 1 Ton 2412.502/16080 16x8 Precast Concrete Box Culv End Sec Each 2412.502/16090 16x9 Precast Concrete Box Culv End Sec Each 2412.503/16080 16x8 Precast Concrete Box Culvert L F 2412.503/16090 16x9 Precast Concrete Box Culvert L F 2442.501/00010 Remove Existing Bridge Ls 2451.501/00107 Structure Excavation Class U C Y 2451.507/00035 Structure Excavation Class U C Y 2451.609/001 1 1/2" Crushed Rock Bedding Ton 2501.502/04018 18" Gs Pipe Apron Each 2501.503/06048 48" Cp Pipe Culvert (Smooth) L F 2501.503/12018 18" Cs Pipe Culvert L F 2502.503/07151 15" Pe Pipe Drain (Smooth) L F 2511.509/00014 Random Riprap Class Iv Ton 2575.504/00110 Rapid Stabilization Method 4 S Y 2575.605/00550 Seeding Acre Bids must be accompanied by a corporate surety bond made in favor of Cottonwood County or a certified check made payable to the Cottonwood County Auditor/Treasurer for 5% of the amount of the bid. Upon execution of the Contract, certified checks or bid bonds will be returned to the unsuccessful bidders within 30 days of opening the bids. The successful bidder will be required to furnish a Surety Bond. The Cottonwood County Board of Commissioners reserves the right to reject any or all bids or to waive defects.

Award

Bridges / Tunnels

$333,125.00

Public - County

Site Work

18

3

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
29
Bidding Soon
338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

May 6, 2024

Project location map

Multiple Locations, Windom, MN


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed