Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 19, 2023 at 7:00 PM
Updated January 29, 2024
Site work and paving for a mixed-use development in Champion Township, Ohio. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.
Todd Fork Bridge Rehabilitation General Contract Base Bid $710,079 Alternate 1 $77,433 Alternate 2 $4,088 This project is located in Warren County at the Little Miami State Park, Intersection of Main Street and Front Street, Morrow, OH 45152. The project involves the Rehabilitation of the Todd Fork Bridge carrying the Little Miami Scenic Trail over the Little Miami River. Work includes painting, railing replacement, miscellaneous structural repairs, and sidewalk improvement for trail detour. Alternative 1 work includes asphalt trail replacement and pavement markings. Alternative 2 includes application of asphalt rejuvenator on bridge deck asphalt. Alternative 3 includes trail fence replacement. All work is to be completed under General Contract. Completion date for all work under this project is June 25, 2024. In compliance with Section 153.08 of the Ohio Revised Code and Section 153:1-8-01 of the Ohio Administrative Code, Bids for this Project are being received, opened, and published through electronic means using the State's electronic bidding service. Bidders may submit requests for consideration of a proposed Substitution for a specified product, equipment, or service to the Architect/Engineer ("A/E") no later than 10 days prior to the bid opening. Additional products, equipment, and services may be accepted as approved Substitutions only by written Addendum. This Project is subject to the State of Ohio's Encouraging Diversity, Growth, and Equity ("EDGE") Business Development Program. A Bidder is required to submit with its Bid and with its Bidder's Qualifications form, certain information about the certified EDGE Business Enterprise(s) participating on the Project with the Bidder. Refer to Section 6.1.10 of the Instructions to Bidders. The EDGE Participation Goal for the Project is five (5.0) percent. The percentage is determined by the contracted value of goods, services, materials, and labor that are provided by EDGEcertified business(es). The participation is calculated on the total amount of each awarded contract. For more information about EDGE, contact the Business Certification Compliance Manager at Stacy.Cornett@development.ohio.gov, or at 77 South High Street, 28th Floor, Columbus, Ohio 43215; or by telephone at (614) 728-0088. The Bidder may be subject to a Pre-Award Affirmative Action Compliance Review in accordance with Section 123:2-5-01 of the Ohio Administrative Code including a review of the Bidder's employment records and an on-site review. The Bidder must indicate on the electronic Bid Form, the locations where its services will be performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting purchases from or investment in any Russian institution or company. Failure to do so may cause the Bid to be rejected as non-responsive. Rehabilitation of the Todd Fork Bridge carrying the Little Miami Scenic Trail over the Little Miami River. Work includes painting, railing replacement, miscellaneous structural repairs, and sidewalk improvement for trail detour. Alternate 1 work includes trail and fence replacement and pavement markings. Alternate 2 includes bridge deck asphalt rejuvenation surface application. Question Deadline 11/30/2023 Online Q/A
Award
Bridges / Tunnels
$710,079.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 14, 2023
January 15, 2024
State Rd NW, Champion Township, OH
Related To This Project
Fairfield, OH
Bid Date: Dec 07 2023
Cincinnati, OH
Bid Date: Nov 30 2023
West Chester, OH
Bid Date: Nov 28 2023
Grove City, OH
--
Lakewood, OH
Bid Date: Nov 15 2023
Cincinnati, OH
Bid Date: Dec 08 2023
Solon, OH
Bid Date: Dec 08 2023
Cincinnati, OH
Bid Date: Nov 15 2023
Eaton, OH
Bid Date: Nov 15 2023
New Philadelphia, OH
--
Wooster, OH
--
Washington Township, OH
Bid Date: Dec 15 2023
Golf Manor, OH
Bid Date: Nov 30 2023
Columbus, OH
--
Dublin, OH
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
